I have commented on the poor discrimination between devices and made them aware of the inconvenience a fault may cause .
cheers lads thanks for your input ....
Read the first post again it is not that confusing .
The report will state that the 125a sub mains from the 400 amp panel board exceed maximum permissible zs values but the disconnection time will be met by the 80 amp switch fuse at source
not yet . Im going in early tomorrow so will test L N .
The main panel and sub mains were installed 5 years ago with no paperwork and not a lot of thought in design .
In your opinion does it warrant a code 2 ?
I agree with this . No need to walk away , Explain you won't certify and take responsibility for work completed by other contractors . You could fit a new board large enough to accommodate a mains change whilst connecting only your circuits .
Over heat stat and 2 port valve are standard safety device on any unvented cylinder . Positive shut off can't be achieved with a 3 port valve hence the additional 2 port .
In dry conditions the human body alone can have a resistance of 100 000 ohms . However , during a sustained shock this resistance will drop rapidly .
Ignoring the air
10 000/100000 = 0.1 amperes
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc