I was installing AV kit in an office refurb job but were not allowed in the rooms until the corridor lighting was working.
One circuit, about 12 intermediates operating a contactor with 3 10a (single phase) runs to the lights.
The sparky had run 2off 3c&e between the switches (lucky, one grey &...