Hi yes it does need bonding as it is extraneous comes in from the outside wall in copper.
But I do see your point and it does make sense what you’re saying. As someone could come in and take the cover off the board which would be dangerous but like you said I can’t do nothing about someone doing...
It’s not really the gas bond that I am bothered about yes it’s not within 600 of entry or any thing it’s the water bonding really. The connection to the water bonding is only through the cross bond on bottom of the boiler. I’m aware the regs don’t say it has to be continuous even though it maybe...
I will keep this short can i be a qs for niceic for 2 different company's?
I am the qs at the company i work for but i am doing alot of guvvy work on a weekend which includes consumer unit changes. i asked my boss/principle duty holder if i could notify it through the company but he has said...
Did a eicr on a upstairs flat, there is 1 main bonding cable from the consumer unit, the gas pipe comes from the gas meter outside and up the wall and straight through the loft to the other side of the flat and down to the boiler. the gas bonding goes out the db and up to the loft then across...
Selling a brand new Mira Advance Flex 8.7KW Shower Unit. It’s all boxed and never used.
£100 pick up from Hull as don’t want to wait 30 days for it to clear in PayPal.
Personally this sounds to me like there is no electrician involved and you are just gonna do all this your self. An electrician will/should come and test and sign this off and if he is not happy with how you have ran the cable then he will not sign it off so if you are not happy with the advice...
What email app are you useing? Try not to use the inbuild email app and just download either the hotmail or gmail or yahoo app and use it through the app. If it’s not one of them emails try blue mail that’s the best I have found for not traditional email clients.
I want to ask about the Zs on the circuits on mine i had to do a zs on every circuit but one of the apprentices who has his in a couple of days is adamant that you only have to do the Zs at the sockets and can calculate the lighting and that. Was you allowed to calculate it as i wasn' and have...
I didnt IR with the rcbo in i did a continuity and it was straight live to earth then disconnected it and ir tested and all was fine, and i dont know what the problem was as far as i can tell it was just the rcbo as i changed it to a standard rcbo with earth fly lead and all was fine
I had problems with these and ouside emergency lighting, did all dead tests and was fine left for a few weeks then power was put on and when i turned them on it tripped instantly so went and had a look and tested the circuit at the last light and had a direct short to earth and it was due to...
Report it if you want to, they is nothing stating you have legally got to its basically down to your own moral code, i personally would tell my boss that its by passed then its up to him if he wants to report it.
As above mate if you have not done any work at all on it then nothing will happen to you it will be the person who did its fault not your so you would not end up in the dock
So you would walk into someones house and turn off the electric till monday when you can get a rod? i know i wouldn't, just tell them the problem try and get the dno out to fix it and dont do any work on it till its sorted. cant go around just turning the electric off to peoples houses for days...
what council workers was they? I didn't know council workers was allowed to search your van? if i got stopped at side of road by someone who just said i work for council i wouldn't be allowing him to search my van.
13A per point not 13A combined so technically 1 double will still be the same as 2 singles as there is 2 points to plug into that been said your paying so it ultimately up to you want get as your paying for it (as long as its safe and within regs which it is)
no worries pal basically a tn-c-s has the earth and neutral connected in the device head
a tn-s usually connects the earth to the in coming cable armouring to supply the earth and a tt you basically supply your own earth by putting in a rod and connecting your path to that.
check this page on...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc