150A MIGs I have used in the past have had 13A plugs.
Only when going to 160-180 have they needed 16A plugs.
I have seen 180A ones on 13A plugs but as soon as you get near the top end of the Amps scale it will blow the 13A fuse.
Check your welder as it will say what the input amps are a d then...
When working in the motor repairs industry you have to fill in test sheets and keep them for so long.
Doing that will do is ok for most things but not for QA record keeping.
A lot of large three phase motors and larger DC motors will start off a bit low on the IR then constantly get better as...
Non of the ones I have used have a timer.
You have to hold finger on button untill you are done.
Much better than when I started when you had wind up meger that you had to wind for a minute.
Felt like hand was going to fall off when you had a few to do LoL
Late last year I used power tool world.
They constantly had the best price
Don't leave it to long as did on some things and found the price had gone up quite a bit.
Seems they price match prity much anything on the internet so if that price goes up so does there's
That should be ok I would have thought.
I would prefer a direct online starter with overload protections but it doesn't have to have one just gives extra protection for overload
The estop should be used with a relay contractor.
You would be better looking for a direct online start stop control box and this may come with estop or you will be able to add it in circuit to work with the internal control circuit
Went to Cockermouth recently and they have a hardware shop very similar.
Even has a museum upstairs with all old tools and stuff.
Free to browse round.
I could have spent hours just looking at stuff.
If three separate units and you have tried different batteries then the faulty units are probably draining to much current.
Are the floro or LED.
I have replaced a few hundred old units over the last few years at work and we are now all LED.
We have dramatically reduced our fail rate.
A lot available but don't like our short hours of daylight in winter.
Most are made for other countries that have more daylight hours to help charge batteries
The BS for IR test is to as you say remove links, supply and test each phase.
To earth and between phase.
A between phase fault won't necessarily show to earth but will still be U/S.
As stated anything above 1 meg is just about acceptable.
The test should be done for 1 minute and this will allow...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc