Again, thanks for all the input.
What I failed to mention at the outset was that, as there's been trenching and ducting involved for the new supply, a shed supply was also laid with 3-core 10mm². With a new sub-main for the shed plus the pre-exiting CU both to be connected, the 100A DP switch...