As a result of intended "change of use", I have had a new supply/meter installed in an existing barn conversion.
There is pre-existing (certified) wiring and an existing CU on the opposite side of the barn to the new meter installation.
The logical route between existing CU & new meter is a 7m exposed surface mount run on a roof truss (there is also plenty of Western Power's ducting off-cuts left on site if relevant).
I am in the process of finishing the spec/drawings for tenders for all the associated works and would welcome advice on whether such a incoming connection is effectively mandated as a single run of 2-core 16mm² SWA only (earth on SWA allowed?)that I can leave un-specified or if there are any alternative solutions worth asking for costings, such as using twin long runs of "Tails" for power with parallel 16mm² earth?
I am principally interested in having facts prior to builders quoting their inhouse-spark back to me second-hand.
There is pre-existing (certified) wiring and an existing CU on the opposite side of the barn to the new meter installation.
The logical route between existing CU & new meter is a 7m exposed surface mount run on a roof truss (there is also plenty of Western Power's ducting off-cuts left on site if relevant).
I am in the process of finishing the spec/drawings for tenders for all the associated works and would welcome advice on whether such a incoming connection is effectively mandated as a single run of 2-core 16mm² SWA only (earth on SWA allowed?)that I can leave un-specified or if there are any alternative solutions worth asking for costings, such as using twin long runs of "Tails" for power with parallel 16mm² earth?
I am principally interested in having facts prior to builders quoting their inhouse-spark back to me second-hand.