The song that started my love of reggae
Followed by the probably the most influential person you have never heard of (sampling in the early 70s, man behind Bob Marley, Althea and Donna, Junior Murvin etc etc, at the forefront of dub music, toaster, innovative genius
and then the classic...
Meter fitters do not have the authority to uprate a fuse.
There have been issues with 100A fuses in cutouts. The fuses will take a sustained overload for a considereable period of time and if subjected to such an overload the fuse carrier gets very warm, some of the fuse carriers in the newer...
The fuse is almost bound to fall out when you do the cu change, why not make sure it is only a 60A?
I never seek authorisation to reduce a fuse rating, only to increase it.
As a matter of course my DNO replaces 100A fuses with 80s whenever they come accross them, often the meters are only rated...
Wouldn't have thought that joining one strip to another would be suitable, you would likely be increasing the amount of current going through the first strip beyond it's design rating. I have only powered over 5m once but for the second strip I ran seperate conductors from the power supply
Moving away from Apple is a lot easier with the Mi user interface. Best purchase I have made recently is buying a Xiaomi phone, ridiculous value for money and I find the miui so intuitive. They have a seperate section so if you want to be controlled by google wanting to do this and that, then...
Don't think you can choose to add it with Stroma. You have to have the 2391 (or equivalent) first. As I understand it, they are not going to endorse somebody for EICRs if they do not have an inspect and test qualification
Almost every time an underground joint is made it is earthed, often by just burying bare conductor but sometimes by a rod with (often bare) conductor crimped to it. A tns supply that has had multiple joints will have multiple earthing points so you can be presented with a supply that looks like...
Did you supply / install the 50mm SWA? If your customer has now been told by your assessor that what you have done is wrong then it is not a suprising reaction but leaves you in a very awkward position. You may have to offer to pay for a third party to rectify the mistake (can a 16mm copper...
To balance the load you would need to use the 3 phase distribution board. Using the single phase board would put all the loads (exc the occasional light ramp load ) on one phase.
How often are the wash machines and dryer going to be running? 13A plug machines?
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc