Work has been postponed due to client approval. I would take a picture but it’s a restricted site and I’d get my arse chewed.
UKPN confirmed that the distance is ‘>20’ and is safe to proceed. The park was constructed in 2003 so it had been signed off.
Going forward it’s going to be a pain...
I wouldn’t want to be any taller!
Yea they are connected conventionally - 3 core flex up the post from a fused cut out into the post head. The earth is connected and it is also bonded to the post.
Health and safety are on site tomorrow to come up with a ‘solution’ so wanted to go in with a...
I agree. But that is kinda what I said?
Nah it wasn’t raining. Or particularly wet. The weather has been fairly warm so I guess humidity could be high if that’s a contributing factor.
The LED fittings could be more resilient than the SoN due to no metal chokes etc.
We were thinking all...
My staff? I wish! I am but a meer peasant.
Surely the PPE and the tower is a protective control measure? No one is in harms way? We’re not working on the lines.. the lamp posts are way out of the ‘danger zone’
Literally asked if there were any ways of grounding the static etc.
In future I should explain the build up in better detail and the particular health and safety procedures to avoid scrutiny!!
I feel that it’s not applicable to add our particular health and safety procedures and the like however the relevant RAMs were completed and signed to which I paid...
It’s a tough one. Agreed about the possible potential difference. I was under the impression of carrying any static down to earth. Unsure on a solution.
The client called UKPN sorry. The overhead lines go through the land lords park and to which the actual pylons are out of bounds for obvious...
Hi guys,
We are replacing lamp post heads on a site and all is going well until we reached a set of 4 underneath 11/33kv pylons. We are getting a horrible ‘belt’ off the casing of the lamp post head. The post is coated so unable to receive a belt at low level. All we can think of is it’s the...
We have put our monitor on for another week and connected it in to monitor voltage. Unfortunately it’s not at the load end but might give us an indication.
Cheers guys. Landlord is a bit tight but gets advice from others. All I’ve got really is that it doesn’t give much allowance for...
Hi guys,
Just after a bit of clarity. After installing an energy logging device as per a client’s request we have highlighted that we have over 200A difference between L1 to L2 and L3. The supply is a big commercial science building with 400A per phase.
This isn’t due to inrush and is...
If you enjoy computers and the construction industry, why not try and combine the two. It has been mentioned before but try a BMS/controls engineer. It would mean more of an understanding in software engineering and can be rewarding as well as an understanding in electrical power and theory.
I...
Had to put 29 lengths in the other day.
Just use a tape measure man and mark out everything equally. Draw it out if you have to.
Just promise me you’ll use a file!
Commercial, block of offices. 63A sub main 3 phase DB. Hardly any circuits in it, literally a small lighting circuit and a socket for the mains room.
4 core is for the super fast 32A 3phase version sorry.
I saw the book online, might have to pursuade the boss to buy one!
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc