Since when have Elecsa stopped sending out certificates with a start and end date. An estate agent customer has asked if the open ended certificate is correct
Yes I have, the problem I have is no dedicated wiring box for the UFH, just the valve heads and feeds from three room stats. Thinking it through I will need a couple of relays to seperate the pumps and boiler feed, are these off the self items at a plumbers
Hi,
I have wired an S Plan with a 3rd valve for UFH.
The system runs with 2 pumps, one dedicated to the UFH. at present I have the boiler and both pumps wired in parralel and called from the orange wire out of the zone valves. How can I wire up to have each pump seperate as at the moment the...
Hi,
Does the wiring runs and wiring up of central heating controls come under BS7671. Would a cert be required for this type of work.
Thanks in advance
Some guidance please..........I have asked EDF to restore the supply to a small shop where the basement is flooded and some circuits may well be wet. From the DNOs intake there is a distribution circuit to the distribution board complete with 80Amp semi enclosed fuse and 2pole cutout. This...