The supply is PME which initially made me think that it could be broken PEN but tested and it seem's fine.
Hot tub wired in armoured all the way. Plastic board. Armoured glanded into box above CU. Earth on sheath wasn't earthed but have put that right today.(was picking up about 50-60v off the...
Got called out to look at a hot-tub. (reasonably new I think) which client was getting a shock off. Have tested everything up to the panel in the Hot Tub. RCD is fine although hasn't tripped when under load. It is when the main motor kicks in that water become's live. Most likely a fault with...
Anyone know of any good LED outside light's which last longer than 2 year's? They seem to all be garbage.
Getting so many customer's coming back after a few month's even. I generally go for a pre-wired LED fitting
security light (with/without PIR) with a IP rated box behind .I always assumed...
If anyone could help me that would be great. Wired a sub-main for an extension from an existing MK split load board in 16mm t+e. MK don't seem to make a 63a MCB for it 50 is the highest. Does anyone know which brand MCB (if there is one) suitable or will just fit in the CU? Wholesaler's...
Have a bit of an awkward run at a job and was debating whether it was easier to wire all the interlinked smokes to a Wago box or JB. They are Aiko smoke alarms and wanted to know whether anyone has done this before and would it make any difference?
Need a bit of help please. Wired a 2 way from upstairs to downstairs then customer wanted a 2 way to side of the bed, obviously didn't think it through enough! At the minute i've got mains and switch wire at top of stairs for downlighters and a three core going downstairs and one going to the...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc