I have been a qualified electrician for Quite a few years but have never really touched solar apart from installs on domestic properties.
I have been invited for an interview for a company that installs, commissions and maintains large commercial systems.
Can anyone point me in the right...
That is the value given after doing a test with a meter.
The generator is fitted with a PMG I’m sure this was meant to stop this happening or at least help?
So let’s cut to the chase am I missing something or do the values on the chart still count on a generator fed installation?
Thank you...
The generator when tested produced a fault current of 2.8Ka
The generator is running prime.
The generator has been serviced every 450hours
I have recently started working for this company after 14 years in fixed wiring, but maybe it doesn’t transfer over like fixed wiring?
The generator is a 800kva and the earth leakage is left off.
The gen can produce the required current to trip the breaker on instantaneous.
The circuit is not a disto circuit it is being used to feed welding equipment.
Can anyone point me in the right direction.
I am working for a company who do temp power for welders etc from a generator.
We have been given a load of new boards to pre check befor they go on site. Powerlock connectors in and then D63 on a commando sockets.
I have put the maximum zs of...
No the contractor who done the whole renovation who got the electrician in who has now gone AWOL got another electrician in who issued the cert above. Which I strongly believe to be made up to cover up the issues that should have been sorted out on the renovation.
They have converted what looks like three bedrooms into four bedrooms new kitchen bathroom and downstairs shower room. Looks nice when you walk in all nice new metal decorative switches and lights everywhere but when you start taking stuff apart the more you find wrong.
Looks like Elesa and...
Sorry I should have been more clear. I got asked to do an EICR of the property in question and failed it on multiple issues. The people that done the renovation then get their electrician in to do an EICR because the electrician who done the work on the renovation is AWOL. No corrective works...
Recently I went to a property of six bedrooms with a shared bathroom and kitchen for all six rooms to do an EICR. Here are some of the issues I found when doing an EICR Ze of 259ohms, single insulated cables ran in walls no C.P.C in lighting circuits and metal fittings there was 25+ issues on my...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc