after

  1. ValgarGrimal

    BG SPD after RCD acceptable?

    Hello, I was looking at installing a SPD into an existing split load RCD BG consumer unit. In the instructions for the SPD it states that it may be positioned before or after a RCD but I have always been of the idea that the SPD needs to go before the RCD due to the RCD potentially tripping...
  2. sythai

    After some ideas please... to light up house driveway sign

    Hi Guys We've got to light up a house name sign for a job we're on. Sign approx 450x300. Any ideas please of what would work ? modern/ contemporary style/ costal proof. Something high end/ decent like Collingwood. Cheers Sy
  3. happysteve

    Electrician to connect tails after isolator fitted (EDF)

    If there isn't a 2-pole isolator there already, I usually get the client to arrange to get one fitted before I do a board change, either through their energy supplier, or (if they also need a PME earth, or their energy supplier is faffing around) through National Grid (formerly WPD). Every time...
  4. alekdavis

    Why did GFCI receptacle fail after one day?

    A 13-year-old GFCI kitchen receptacle went bad, so I replaced it with a new one I bought from Lowe's (Eaton model TWRSGF20). After one day, this one failed as well (the red dot is flashing with the yellow dot solid which, according to the manual, means it needs to be replaced). I cannot reset...
  5. baldelectrician

    Split concentric after meter, queries

    Did an EICR that passed 5 years ago Several things in the picture raised concerns for me. Comments please - photo at end First photo shows a split concentric in use AFTER the meter, the supply is a TNC-S supply and the split concentric has the following items Single insulated neutral...
  6. Cankeredlamentations

    What to do with distributers earth after conversion to TT & advice on where to place the rod

    Afternoon all I am looking for some advice as on what to with the suppliers earth after a conversion to a TT system. Current issue is earthing arrangement is TNS, reading was nearly 60 Ohms, reported issued to DNO, they are effectively washing their hands of it as the (based on what the...
  7. B

    Immersion Heater add Wifi control? can you add simple wifi switch AFTER the existing fused spur.

    Hi, Have normal fused immersion heater switch. I would like to add a smart wifi switch to it so when my Solar is producing over 3k spare, going back to the grid (once the battery is charged) it can heat the water instead, save using the gas for the PM heat up. Will use Home Assistant. I know...
  8. B

    Bathroom LED Mirror Turns On Automatically After Power Cut

    Hi All I have recently had a new bathroom mirror installed with a built in LED and Demister that is turned on using a motion sensor. The mirror works perfectly, except when there is a power cut. When the power is restored, the mirror LED automatically turns on, this is not ideal if we are out...
  9. H

    EICR Test Fail, before and after

    Hi, recently had an EICR test done by 'Landlord Certificates' which failed due to circuite 3 having two radial circuits into a single 32amp MCB, they advised splitting it into two 20amp MCB's and quoted £174 including EICR certificate. The Electrian appears to have simply taken out the 32amp...
  10. P

    Rear indicator fails after 35 mins driving

    Rather weird this one. After 35-40 mins driving the nearside rear indicator stops working. Outside temp or lights on or off or how much usage doesn't seem to make any difference. It still stops working after 35 mins. If I stop for a coffee....it starts to work again. Any ideas? Stuart
  11. Q

    Do companies contact you after passing SECTT test?

    I’ve just sat my SECTT test and passed, In the pass email it stated that companies in my area would be sent a list of people who passed the test and may be able to contact me directly, I am currently quite unsure if I will be offered an apprenticeship from any the companies I have been in...
  12. M

    P0340 code after Head gasket replacement

    Please skip to the next paragraph to skip my intro. Sitting at a desk is not how I want to spend the rest of my life, so I've decided to become a mechanic. They say "if your job is your hobby, you'll never work a day in your life." I've always enjoyed resurrecting things that others deem...
  13. PuddingMan

    Need to get new EICR after installing EV Charger?

    Hello everyone! I am curious to know if we need a new Electrical Installation Condition Report (EICR) after installing an electric vehicle charger at our property. Does anyone have any knowledge or experience with this? Any advice would be appreciated. The most recent EICR was only issued in...
  14. N

    G4 LED stay on after Dimmer is Switched Off

    The G4 110V 3W dimmable bulbs I purchased work with a dimmer. I can brighten them and dim them, but when I turn the dimmer off, the LED bulbs remain on (the same level as the lowest brightness). I am using a Lutron Maestro LED+ Dimmer. This style dimmer has tiny lights built into the switch so...
  15. J

    What is the incoming Voltage Before and After the Service Fuse?

    I know that after the Henley Block which houses the Service Mains fuse, the Voltage is 230v If we was to remove the fuse and Measure the incoming Live wire, would the Voltage still be 230v?
  16. saint elmo

    what next after level 3 diploma?

    hi im unsure of what to do next as far as experience/training i have completed level 2+3 electrical installations diplomas at college i finished in june i was helping out a sparky the odd day here and there but he relocated im going to apply for the electrial labourers card from ECS to try and...
  17. C

    CAN I MAKE MY 1960S FRIEDLAND DOOR CHIME STAY ON FOR A DELAY AFTER PUSH IS RELEASED?

    Our old Friedland chime all too often now emits a only faint "ding"- because the person at the door (usually a delivery driver) just "dabs" at the button. It works from three buttons:- Outside of porch; inner front door (the outer front door when the house was built); back door. The...
  18. D

    EICR not received as promised after payment

    I commissioned an EICR to be done on a property that is in Wales as this is now a requirement in order to let on any new tenancies after 1st December 2022 (Renting Homes Act 2016). I was at the property whilst the EICR was being done and was told that it would fail on a hairline fracture on a...
  19. B

    UK SMEG Opera A3 120cm after 15 mins trips circuit breaker

    Hi guys, 5 year old SMEG Opera A3 120cm Dual Oven. Small Oven RHS... Works perfectly OK... Large Oven LHS.... After 15 mins trips the RCD on Consumer Unit. Replaced circular element at rear. Replaced large element on top. Problem still exists. Any advice... Tank you in Advance....
  20. ancienthistory

    Turning consumer unit on after water damage

    Hello wise electricians of the world! I am in the UK. Recently we had a water leak which caused some damage in our home, we are currently trying to dry everything out. The water certainly affected at least some electrical circuits (e.g. water was coming through kitchen ceiling spot lights.) My...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Advert

Back
Top