arial | Page 5

arial

  1. T

    City and Guilds 236 Parts 1 and 2

    Evening All, I have City and Guilds 236 Parts 1 and 2 and have recently completed my 17th Edition and also have my City and Guilds 2391 Inspection and Testing. My question is: does the industry still recognise my City and Guilds 236 Parts 1 and 2? Thanks Tony
  2. S

    Cancellations Within Cooling Off Period But After Work Has Started

    Here's a good one...Domestic Customers have rights under the some legislation called "The Cancellation of Contracts made in a Consumer's Home or Place of Work etc. Regulations 2008". Here's a hypothetical scenario: Day 1: go and look at a fault, board is ancient and falling apart, quote...
  3. S

    calculating diversity for lighting circuit

    Hi I'm sitting my unit 4 exam for C &G 2330 electrotechnical course. I'm a little confused to calculate the answer to this question I can't get the same answer 10 x 60w fluorescent lamps will have an assumed current demand at 230v of a. 2.6A b. 4.35 A c. 4.7 A d. 7.83...
  4. M

    MCS Sign-off for someone else question!!!

    Just been approached by a company who are tendering for a construction job with PV on the roof. They want to do an install (have their own roofers/electricians etc) have asked me to sign it off for them so they can get an MCS certificate. Now before everyone starts screaming, I know this is a...
  5. M

    3 phase motors

    Why do theese motors require a start up circuit? What is the function of the phase monitor?
  6. RWJ

    NICEIC Certification Scheme NICEIC Part P Survey

    NICEIC is asking government to listen to its registered contractors over proposed changes to Part P of the Building Regulations. A comprehensive survey was sent out to NICEIC registered contractors and 1,500 surveys were completed and returned. Find out how the contractors surveyed view...
  7. T

    Apprenticeship Wanted

    Hello Im Thomas i am in need of an electrical apprenticeship. I am fully qualified to City and Guilds 2330 Level 2 electrical installation and am currently studying City and Guilds 2330 Level 3 electrical installation and i am required to get an apprenticeship so i can complete level 3. I...
  8. S

    350 KVA HV Transformer? 3 phase calculation confusion

    I need to buy a 3 phase HV transformer for an apartment block 1382 Amps is the total predicted single phase load after diversity. 1 Phase KW 1382 Amps 230 Volts ( I/V) 317.86 KW KW 1 Phase KW to KVA 317.86 KW 0.9 Power factor ( KW x P.F. = KVA) 353 KVA KVA Single Phase to 3...
  9. A

    OLCI complaints, feedback or suggestions

    Hi all, Alana Fox here from OLCI Construction Training. If you have any questions, OLCI reviews or OLCI complaints, please email me on [email protected] or phone me on 0800 316 8100. We constantly work to improve our service and levels of support, and welcome your feedback, suggestions...
  10. Dan

    Reported Post by Engineer54

    Engineer54 has reported a post. Reason: Post: A good guide For 'exported PME' and outbuildings! Forum: Electrical Forum | General Electrical Forum Assigned Moderators: JASON.S, Grumpygrouter, phil7677, Lenny, Oli, Notsosmart, sintra Posted by: amberleaf Original Content:
  11. alisha

    Tools for glands installation and dismantle

    I would much more appreciate to support me regarding find tools acceptable for safe installation and dismantle of glands. Please send details of manufacture. Thank you in advance
  12. B

    PV G59 application for connection with DNO

    Hi I am gettingmyself prepared for G59 connection applications for PV systems. Guidance onwhat is needed with regards to technical date and drawings would be muchappreciated. Withreference for the application form for 'e-on' http://www.eon-uk.com/downloads/G59_APP_FORM_AW.pdf...
  13. L

    Accenta 6 Alarm: Lost user code

    Hey there, Have any of you fellas got experience of working with Accenta 6 alarms? Went to a customer today who has one of these alarms and he doesn't know his user code (recent change of occupancy). I checked on the internet whilst there for a manual / instructions and found one which I...
  14. G

    TT system testing - problem

    Hi, can anybody throw some light on a problem / confusion i have? I'm in the process of installing a new TT system. The existing earth electrode had a high resistance in excess of 2Mohms. I've inserted a new electrode in a new location and measured the resistance immediately after inserting the...
  15. B

    Transportable Building

    The local Golf Club have a metal shipping container which they want to install 2 x twin sockets for Buggie Chargers. I have spoken to NICEIC tec help who has told me I can not take a supply directly into the container it has to be a plug and socket as its classed as transportable (even...
  16. O

    Complete Picture software

    Hi Has any one used "complete picture" software for their qms? i am struggling to understand how to compile a qms and am reluctant to shell out on another course. i seems to offer a straight forward way to create a quality management system, but i would be keen to know what others think. cheers
  17. B

    thinking of moving to sunnier climes your qualified to work in the following

    BS 7671 Adopted by the follow Mauritius, St Lucia, St Vincent, Sierra Leone, Sri Lanka, Trinidad and Tobago and Uganda. So your qualified to work in any of the above, Personally id give Sierra Leone and uganda a miss but it might be useful for our european collegues
  18. V

    Advice on my rirst underfloor heating in a bathroom

    Hello, I’m after some more advice on my first rewire, it’s in relation to a under floor heating in the bathroom, firstly should I take the power from the upstairs ring, or run a separate feed to it? (the bloke only decided he wanted it today and most of the cables are already plastered in) Also...
  19. S

    Fit review - Breaking News

    Confirming fears that have been mounting in recent weeks, Energy Secretary Chris Huhne has launched a comprehensive review of the UK feed-in tariff (FiT) scheme, following claims that large-scale solar farms could ‘soak up money’ which was reportedly intended to help homes, communities and small...
  20. L

    Training Help

    Hi All, I'm new to this forum so please bare with me. I currently work full time and will not be able to reduce my hours as I have a home to support. I am extremely interested in learning the electrical trade but I have found college's to be unhelpful unless I reduce my hours, which is...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top