Hello all,
Im doing a college assignment and Im being asked to give advantages and disadvantages of MICC with and WITHOUT Pvc sheathing..
Im not used to the cable at all if im honest so ive done some research but can find very little on non pvc insulated pyro.
Can anyone point me in the...
Hello,
Can someone please help me describe what is going on in this wiring diagram I have drawn. I will upload the diagram and my poor description to go with it.
Thank you.
Hello,
I've been working on an electrical assignment as part of my training, I have completed most of it but I seem to be falling down on a more simple part of the assignment on the basis of terminology and further explanation, I have found it a little difficult to source the information I...
Hello all, firstly im well aware it’s frowned upon to ask college related questions for you guys to answer so I’ll try and phrase this accordingly.
I don’t want your answer just a pointer if possible.
I’ve a layout of a building with a main supply panel and 4 dbs closeby. The 4 dbs will feed...
Hello,
Please could someone help me with an assignment. It is due for submission in 13 days.
Would really appreciate if someone could take the time to assist.
I will attach image of the first task on the assignment.
Thank you
Hi there, I have just moved from Cambridge to Plymouth upon completing my Level 2 & 3 Electrical installation training (2365).
I have some assignment work to finish off for it and I'm stuck on the last task of technical drawings (cable routing). As I have now moved from Cambridge I'm not able...
Hi there, I have just moved from Cambridge to Plymouth upon completing my Level 2 & 3 Electrical installation training (2365).
I have some assignment work to finish off for it and I'm stuck on the last task of technical drawings (cable routing). As I have now moved from Cambridge I'm not able...
I've got a college assignment based around design. There's 4 DBs:
Main CCU
DB1 - Lighting
DB2 - Power
DB3 - Offices
I'm assuming that the Main CCU is the intake and that then has distribution circuits to the three DBs. Cool, so I started working through the lighting DB, got about 30A total...
Determine the minimum size of cpc for the circuit giving consideration to; Disconnection times Thermal Constraints?
Here is what I have worked out so far for the circuit -
Ib=p/(Ulx√3) = 12000/(400 x 1.732) = 17.32Amps
From Table B6 I selected a C20 which has a max Zs of 0.87 Ω
20>17.32...
I'm currently doing a 2357-608 assignment on fault finding and I have this question,
Describe, for this installation, Two types of faults most likely to occur in each of the following;
A) Wiring systems in the loft space above the first floor.
B) Equipment and accessories in the intake room...
Hi, I'm new to the electrical field, have passed my level 2 and learning my level 3 but regrettably have very little 1st fix experience.
As an assignment I have been asked to provide a fixture and fitting list to a made up drawing of a first floor house(lounge/halllway/kitchen/downstairs toilet/...
Okay, I know this question pops up a lot but I want to be really specific, and ask in the trainee bit for your thoughts.
I've done my first inspect & test assignment, and one of the questions is "show using the help of a diagram the earth fault loop path for an earth fault in the lighting...
Hello , I'm struggling with the "Health and safety assignment detached house refurbishment pre attendance test version 4" and need help as I am loosing my mind .... Failed online 4 times and dozens of books read most over and over wondering what and where am I going wrong as they just msg FAILED...
Just finished my last 2365-03 assignment (305, the installation one). I believe this is similar to a differently-numbered unit for the 2357. Assuming it's all alright, that means I'm about done. :50:
I now realise there's a lot about specifying wiring systems that I don't know! I think I've got...
i vent to local college to ask for this course but the business agent who care for recruit students for this course didn't have clue if this course have writing exam or just on-line exam.. please can any one who past this course explain what kind of exams we have to do on this course..did they...
Hi, I was wondering if anyone could me with my assignment. I have a couple of questions which needs to be answered.
1: The entrance light only turn off when the protective device is turned off.
my answer: the control or switch is missing from the line conductor.
2: Overload current on a...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc