Hey and thanks for reading,
I'm in the middle of purchasing three of these boards (each draws 135 watts, so 405 watts total) but am struggling with all of the Meanwell 480w options. Can't quite wrap my head around anything other than the wattage and would appreciate hearing from someone with...
Hi guys,
Just wanted to ask if anyone knew whether its ok to run twin and earth in a purpose built skirting board designed to enclose cables.
I have seen pvc skirting boards and mdf skirting boards that are specially designed to enclose cables. All you'd have to do is a chase on the wall down...
Looking at a domestic RCBO 10way board which includes SPD and AFDD protection. Iv looked but cant seem to find a board that offers all these things.
I thought hager offered RCBO's with AFD protection, but I cant seem to find it as 1 package.
Fusebox offer a decent 10way SPD board but the...
Can anyone point me to reg that says about plastic boards under stairs or does one not exist
On an EICR and they have a plastic baord under the stairs.. C2 or C3?
hello everyone, I have a little problem. I've got a three phase board, it has the three phase sauna, one phase lighting and sockets connected to it. The problem i am facing right now. This is a comercial unit. So the problem is that the sauna makes the RCD trip every so often. And the board...
Just been watching the daily briefing from Downing Street and was amazed to see sockets and accessories mounted in the skirting. Perhaps it needs a rewire.
Had the WD40 out earlier cleaning my fiancees bike up.
Saw on the side they suggest it can be sprayed into mcbs on a fuse board.
Can't say I have ever thought of that. I know it can be used on contacts but it somehow seems wrong to be spraying a liquid into a fuse board as shown on the can!
So recently i have been given a lot of changes to the work im used to, quick example = im ok with single phase boards but i am not competent or confident enough in three phase. My boss is a very angry guy..... should i just go for it or should i refuse until i have training ?
cheers
Hello chaps, looking at different boards for dwellings. MK don’t make them anymore, Schneider are hit and miss with knockouts knocking out and the wholesaler “own brands” ( the ones they push) can be somewhat tight. I’m looking at Hager and wondering on views, before I commit to buying the 12 I...
Hi guys
I'm having major works being done on our flats by the council.
There is no periodic inspection lables on the boards in communal areas.
How many years is required between each periodic test??
Council said it an be up to ten years???
I sure it was no longer than 5.
Any advice would be...
Hello all,
I'm curious. Crabtree boards with their moduler click in busbar system. Does anyone have a trick to linking the busbar and the earth for continuity testing at all?
Hi all, first post, and it relates to quite a challenging installation.
The short version is that I'm working through remedial work on a 75 page EICR on a site with 24 distribution boards, hit a very nasty C1, have resolved it, but now have max Zs issues that were actually there before but not...
I’m
An NICEIC DI.
I haven’t got around to doing my 18th yet and I haven’t got the new literature.
How do you determine if you need to fit an SPD board.
Should I start fitting these on all my jobs now?
Anyone else use MCG fuse boards before and never hand any issues or reports of them being poor in reliability long term?
recently had to carry out a DB change and due to size and the main switch on the LHS I was advised by CEF to use MCG.
The quality of the board was not brilliant and I only...
We're interested in what changes you've made to become 18th edition compliant.
We want to ensure we're stocking what you need most at Electrical2Go.
So Overload and Surge Protection...
Are you buying fully populated 18th Edition boards? Or buying cheaper boards and adapting?
Cheers...
I'm fitting two replacement sub-mains panels as part of a long-term upgrade from split-phase to three phase on a part-domestic part-commercial site (my own gaff). I'm using all RCBOs because I like them, but am less keen on the cost of the commercial variants ...
Fellow spark says one MUST use...
Hi just after opinions on this one got three 3 phase supplies all 25mm 4 core swa, armour not been used for earth would you run a seperate 16mm earth for each supply or just loop all the earths from 1 16mm all the supplies are right next to each other
I work for a company who installs electric heaters.
Usually we remove old storage heaters and replace them with our heaters using the same point with a new switched fcu.
The fuse board is usually just an old Wylex type with just an on off switch and non switched fuses.
The board is powered...
ok a couple of questions
ill keep it simple
its been ages since I had anything to do with E7,
is an E7 board supplying storage heaters still ok on a non rcd board ie classed as fixed equip ?
who is responsible for the tails? from head to meter and meter to board
thanks
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc