Anyone no latest list/ edition of noticeable work to building control, part p.
Newest one I can find after a quick Google is 2013. I'm sure it was updated 2017.
If so can someone post a link,
Thanks.
just wondering how you guys,install temp electrics to portacabins
Seen a lot of installs on sites & at schools where I don’t think it’s correct.
Mainly earthing,& earthing conductors,or am I being over cautious,cheers.
Hi guys,
Another question for those who've ever had this issue or experience with pool installations.
I'm due to begin work on a timber framed building inside a steel framed building housing a swimming pool. The cabin would be mostly in Zone 2, potentially overlapping Zone 1.
Would this cabin...
Hello all.
New here so i may get flamed if this is covered somewhere else, but I've been scouring google for ages without any conclusions.
I'm of the understanding now that AFDDs need to be installed in certain locations, sleeping accommodation being the one I'm interested in as it constitutes a...
Hi Guys,
This is my situation:
Existing brick building demolished and replaced with steel frame, steel panel clad warehouse/storage structure.
Original building had two electrical supplies:
1 x 63A single phase and neutral via 3 core PVC SWA PVC
1 x 100A TPN via 4 core PVC SWA PVC plus equal...
Hi all.
I have been trying to do some reading up on my options for possibly doing a HNC next year. I had originally looked at doing a HNC in Electrical & Electronic Engineering as it seemed the most logical step forwards from my current qualifications as follows
Apprenticeship NVQ L3
2391...
Had an email from some outfit suggesying to keep building control happy we sparks should do a course to certify our extractor fans, cooker hoods etc.. never been asked for one yet but maybe one day i will. If i recall in the niceic online portal there is a form dv1 for certificating such things...
Hello,
I bought a motor for the skateboard and a ESC to control the speed , so i found this (80A) and bought it .
someone told me that the motor and the ESC do not fit together and it won't work for me , is it correct ? and if so what cheap ESC do you recommend?
thank you :)
When working on a house where a building inspector is involved do the electrics get notified twice?
What I mean is, the building inspector signs off the work after he's happy with it, does that mean he's signed to say he's happy with all the electrics and that they have been notified? I...
New build houses, full system boilers with the big cylinders with seperate thermal cut out and temperature probe which come with a pre fitted link connecting them.
Have been told to remove this link and feed the main live feed for the whole system through it (after the fused switch spur) so if...
Currently working on a renovation that has plans for four ensuites. Client has decided now to keep one as a dressing room instead and would like some power provided. There will be pipework presented for future change of use but will be boxed in etc.
What do you think building control will...
if you are having trouble sleeping, take a read of this ...
https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/697525/DBSCG_secure.pdf
Some useful stuff in it ....
Happy reading
Evening all.
Note sure about this one:
I have a job of new circuits to install for a new domestic extension - nothing fancy.
It has a ensuite shower / toilet on the new install, 2 walls of the en-suite are internal to the extension, 1 wall backs on to next doors extension (touching), and...
When I worked for my previous electrical company back in 2015 in which they were not certified to any scheme and they didn’t have any real college qualifications as in 16th or 17th edition, they did not have any electrical qualifications at all. However, they were the most recommended...
just looked at a job 800 circuits so it is a bit building.
They regularly have maintenance and shut downs on the LV equipment.
Would it ever been acceptable to limitate the LV equipment if a shut down wanted to be avoided by the client?
Hi all i was hoping for some advice, I am carrying out an annual emergency lighting test tomorrow in a hotel. Part of the hotel is no longer in use and all supplies have been locked off. Should this part of the building still have emergency lighting in place in case emergency services need access ?
I was just thinking how commercial electrical work is not notifiable to building control as it doesn't come under part P, but there's a lot of other building regulations that can come up depending on the extent of the electrical work, we're talking part L and teams from BREEAM turning up. So it...