starting job next thursday adjusting a heating system..
there currently is one heating sytem for 3 parts of a building which is rented out as doctors , dentist and a flat...
we plan to change the 2 channel time clock for a 4 channel timeclock and add 4 new valves , doctors heating, dentist...
Ive applied for a maintainance electrician job at Jaguar and have been asked to attend an assessment centre. Does anyone have any idea of what they involve? It states some stuff on the website but it seems that for different jobs the assessment centre tasks vary. Has anyone attended on after...
michael071284
Thread
assessment
centre
company
electricians' talk
tests
years
Hi Gang
I'm off to do a quote for PV on a shopping centre next week.
They want a system as big as they can get, so I guess 50kW
Whats the situation with the EPC on something like this?
hi
ive been called by a local plumer to do job
what it is is a combi hes swapped and wants wiring centre changing as well as exrernal time clock/stat wiring
the combi he taken out already has all wiring there at present.
the thing is theres a mid valve, frost stat and wiring centre.
the combi...
Newsome3
Thread
centre
clock
combi
electricians' talk
heating
question
wiring
I do a few small commercial PIR/EICRS including a dentist surgery & a day centre, but mostly just domestic. I have been asked to look into doing an EICR on a fair sized medical centre ( am guessing approx 10-12 rooms per floor, 2 story building) . Its a pretty new build & hopefully installation...
andyyoyo
Thread
centre
eicr
electricians' talk
installation
manager
medical
rooms
A neighbour has a through lounge with a centre ceiling light (chandelier type) at both ends as well as 2 wall lights at both ends of the room (6 fittings in total). They are controlled by a 3 gang dimmer switch, 1 for each centre light and 1 for all 4 wall lights. All of sudden none of these...
Steve698
Thread
centre
electricians' talk
fault
help
light
lighting
lights
needed
neutral
proper
Any of you guys local to me know anbody thats any good in MCR. Need my bosch 36v sds servicing. been a good servant, wonder if itd had its day, runs noticeably slower than my new one, and the hammer action when chiselling is erratic,
Kiers1970
Thread
bosch
centre
electricians' talk
electriians mnchester
manchester
power
service
tool
wanted
hello want to start electrician training, just wanted to get a review on a centre, im planning on doing my training at able skills in dartford any help would be welcomed.
Hello All,
I am new here so please forgive if there any mistakes. A month ago I was planning to install a couple light which go under the wall mounted kitchen cupboards. Upon finding a junction box which I tested a with a multi electrical test meter that the when the light switch is...
It’s not a question but an open discussion.
I’ve had two flats both within .75KM of major 33 / 11KV substations. Both substations equipped with On Load Tap Changes to regulate the voltage to the local supply network.
I worked regular nights at one time, so I would arrive home at 06-20 ish...
Hi All
I have always had a problem with the idea of a centre tap on the secondary windings of a transformer being tied to to ground. I understand the reasons this is done and why it works apart from the fact that i would expect the centre tap of a winding to have given ptential differance from...
Hi guys,
A bit of guidance required, am down to wire up a central heating system along with underfloor heating( ufh is made by John guest) plumber has left me with a heating wiring centre and also an 8 zone underfloor heating panel, looks like a f/a panel. question is.... Do I need the wiring...
My AM2
A few years ago I took my AM2 and I was given a fault switch. My examiner refused to come from behind his desk to change it and insisted it was not faulty, only when i took a bell unit and the switch over to him and proved in front of him that it was faulty he finaly (after me waisting...
pap1986
Thread
am2
behind
centre
electricians' talk
faulty
funny
story
switch
We're based in Watford and would like to enroll a couple of the guys for their 17th ed training, but wanted a recommendation please. I usually do all training through the NICEIC, but my experience of the Solar PV course was so bad, i'm going to look elsewhere...not to mention they seem to be...
jjnr78
Thread
17th
centre
edition
electricians' talk
recommended
training
Hi im wiring a y plan heating system which ive done before a few times but cant seem to get my head around it. A few questions really. Q1 does boiler supply come from wiring centre with fcu close by or need its own circuit from c.u. via fcu. Can wiring centre come from fcu of ring circuit (would...
biggles
Thread
aus
boiler
centre
electricians' talk
heating
plan
right
supply
system
wiring
y plan
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc