Hi Guys
Quick question about filling out a Domestic Electrical Instalation Cert for the NICEIC. I have changed a consumer unit, Added a few circuits and a sub main to a garage. The System is TNCS so i took a SWA XLPE cable to the garage with the outer shief eartherd at both ends along with the...
Hi Guys a few questions
When you cant verify the Characteristics of primary supply overcurrent device is it a case of just putting LIM for all options?
Secondly when filling out the circuit details do you put the RCD and Main Switch as they are on the board? I usually just put the circuits in...
Hi All
Having just fitted a brand new fan assisted wood burner to an existing outlet (fused Spur) the customer has informed me he wiii not pay me until he has the relevant certificate. I dont think he needs one as the heater has been tested at manufacture.Can anyone advise please !!!
been to start a job today which I have previously posted about, fire damage to bedroom and hallway in a ground floor flat, after the fire, supplier came out and removed main fuse customer new nothing about it, with the meter being outside fire brigade must of informed them and they have took it...
Hi,
Can a PIR cert still be used for installations over 100A TPN? I've seen a few that have been issued this year but am not sure. The NIC helpline wasn't very helpful and just wanted to sell me some of their EICRs for over 100A.
Thanks
James
Been told by my boss that both peak and off peak boards should be on the same eicr, I have said that as the boards are separate then it should be two. Am I just being a numpty or is he right. His argument is they share the same supply so one cert.
Have looked in gn3 but can't seem to find...
just finishing of a rewire and ready to fill in the eic cert, at the moment the supply as 60A with 16mm tails from head to meter, the dno are coming out to replace it all due to bitchumen leaking from head but they said it might take up 6 weeks, so do I have to put on the eic what it as now and...
Hi, I have been using Amtech Software for a few years now but find it very expensive to keep up-to date.
A friend recommended Easy Cert, it looks quite good. I am just after some views on which you would all recommend using? Is there other software worth a try?
Many Thanks Davey!
i recently had a call from a customer who has had his electric meter removed by the energy supplier. he says he needs a certificate before they will come back out and install a new one. as i havent come across this problem before what type of cert would i issue ??
would it be a eicr and just LIM...
Hi Guys,
I have UK PN altering a service at a job for me, according to their paperwork they want:
Before your meter can be connected,UK Power Networks, and those responsiblefor the electricity meter, require a completedElectrical Installation Completion Certificatein line with the current...
Hi
Just a quickie, the main switch or circuit breaker part of the electrical installation certificate, that related to the main switch on the consumer unit? Just having a brain freeze!
hello im looking at purchasing easycert to run a windows pc in office and also to use a windows tablet in the field whilst doing inspections and i cant seem to find out if it will work with a windows tablet and sync together ?
just getting ready to go self employed, going to start advertising in the new year never had much involvement with cert's the full eic i have no problem with, looking at the minor works cert obviously its only for additions to a existing circuit and alterations but not for a new circuit so say...
I'm on a job at the min and have seen the Domestic elec cert for the C.U. change they had done in 2009.
The cert says 10mm bonds to gas and water intakes but they are nowhere to be seen.
In the location box its marked as in cupboard but they definatley aint there.
I'm aware that a soldered...
ive just had a text from my customer which follows:
Cal, you need to power up the hob mate, first thing in the morning, its part of your remit, should be on the cert, see you there.
Weve just finished a full rewire there, all tested, all good and passed, hob working, (its electric FYI) certs...
evening,
I've got to install a new shower circuit to a property on monday. Now once installed do i need to test just that circuit and RCD's etc and record the results on a completion cert or do i have to test all the other circuits aswell?
thanks chris