check a trade is it worth it? is it waste of 500 quid, do u have to bid on jobs or as you listed you get them, asgot person coming round next thursday to pressure sale to get us to join
Just a little wake up call to any one who carries out EICR's if you carry out inspections or any other work for that matter where electrium boards are installed check them for the Recalled MCB's,you probably you do but having come across them on inspections in three separate houses over the past...
Thought I had posted this back in Jan, but looks like it didnt post.
A meter reader turned up unannounced to take a reading/inspection of the PV installation at my setting, said this was normal and would happen every 2yrs !
danesol
Thread
check
inspection
meter
meter reading
reading
system
turned
We're getting more and more calls to examine and fix PV systems that were installed by now non-trading organisations.
So were' looking at coming up with some a standard set of fees, plus want to know if the workmanship warranty companies have their own tame fixers / installers or whether it's...
Hello guys
the niceic is coming to my home soon and they are going to check my work. When i phoned em up one if the advisors on the other side of the phone advised me that they are not concerned either you have submitted it to building control just that you can test and carry out everything ok...
Davey1988
Thread
certification
certsure
check
don't
niceic
other
result
scheme
sheets
test
visit
I've finished a PIR yesterday and am just going over the paperwork. I just realised that I need to go back and do a phase check on the incoming 3-phase power lines. I've told the client I'll pop back in to do it but he has asked if I will need to shut down the power to the building to do this, I...
Hi I have put a price in for a four bed new build, the customer has come back to me saying he thought the price would be nearer £4500-£5000 for labour I have gone in at £6250 labour plus £1440 for materials. What do you guys think am I way off the mark?
This is a rough idea what is involved...
Ive tried searching but not getting info I need. Would appreciate any advice as pretty nervous about my assessment !
Test results - We have our test results all stored on ipad and backed up on Macbook. How should I present these to the assessor will he be cool with flicking though our iPad or...
The town I live in has been getting old metallic water pipes replaced with plastic, the water board has issued everyone with letters recommending "that you have your electrical earthing arrangements checked as it is possible, particularly for older properties with metallic service pipes that the...
Hi there,
I'm Steve from Cumbria, just joined. I usually mess about with vintage radios and the like, but my Rover Metro has just started playing up and I thought I'd ask for advice before replacing any parts willy nilly.
When I switch the headlights on, the dipped beam...
stevekendal
Thread
buzzer
check
headlight
hello
lights
member
new
new member
problem
relay
sounds
switched
Hi guys
A little advice here would be much appreciated , it's been a long head ache day!
Had a ring circuit in a house today with high readings end to end on all three , they where in there 40s , 50s and 60s but got a good r1 + r2 and a good Zs , is this normal to be able to have high end to...
nc12345
Thread
cables
check
circuit
readings
sockets
three
values
Hi peeps
I have continuity measurements on a ring final circuit of: L/L 1.4, N/N 0.78, E/E 1.7
Loose connections somewhere?
There is a new CU with RCD.
Insulation resistance measurements are good.
There is a boiler added into the circuit as a spur.
Any suggestions or comments?
THANKS!!
:) :) :)
Can someone please just check over my working & diversity calcs for the following CU change:
Supply is 100amp TNC-S with 25mm tails, 16mm Main earth & 10mm bonding so all good there.
Working from OSG Table A2: Working off number 9 (Standard arrangement of circuits in accordance with Appendix H)...
Hi All,
I have recently passed my Level 2 C&G 2365 and 17th Edition and was meant to start my Level 3 C&G 2357 in January but it looks like due to numbers this is now not going to happen until September.
I have been informed that I could go on and do the Inspection and Test 2394/5 but have...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc