Finally after being let down by MMU I've finally managed to complete my HND in Electronics and Electrical Engineering at my local college.
New module I've learnt is Pneumatics and hydraulics which is quite interesting.
Hello everyone,
I have been lurking the forum for some time, plucking knowledge when needed.
I completed an all in one buddle course back in 2012, this was 6 week testing, 17th edition, part p and lvl2 2392 testing. I then begun working on site, where I have now completed my NVQ 3 2356.
I...
Hi there,
I am an apprentice and i have worked for my boss for about 18 months now and I feel as that I know a good amount of electrical knowledge and i am still on £2.68 an hour. I have already completed a C&G 2330 LV2 and I have been on a 2357 C&G LV3 With the NVQ LV3. I have done my 1st...
I've posted on this subject in other areas in this forum but to no avail.
I'm taking 2394/5 combined c&g course at a training centre in Manchester on 28/7/14. I only have past experience of IR and cont testing but nothing else. I have gn3 and exam success books in the post to me for some heavy...
Happy to say I completed my college work yesterday ending with the initial verification and fault finding unit. Now to get cracking with the NVQ and get my portfolio completed.
Feels good to have the exams out the way :grin:
hi all
I am new to this board so be with me...
I m trying to get into the industry through OLCI training and ive completed level 3 and level 4 of the 2330/2357 (it keeps changing!) and have passed my 17thedition wire regs
the final part need to complete is the NVQ whereby you need more on site...
Hi all
I discussed a similar situation in a previous thread but the topic keeps popping up with testing jobs that I seem to be attracting at the moment.I got offered a job carrying out EICR's for the MOD and the rate of pay was by the property?? In other words, if I don't knock out 4 or 5 a...
I hope someone can help.
I've taken on a large project, new build oak frame house. Customer happy to pay deposit and then money at completion of first fix. Completion of second fix has been delayed as they've run out of money to complete parts of the building but a large part of the second...
Guys, I'm looking to leave BT after 9 years. I completed a 3 year apprenticeship before moving in to the planning office to perform the role of electrical designer, and as result I have limited practical experience. Please suggest what courses will benefit me to improve my employability when...
Customer is happy,so am I (£2000) later for a 2 bed terrace that took 3 days to complete.
Reason for posting is I have not even bothered to notify LABC,I'm not registered with a scam! Customer was not bothered about certs etc! Although I've completed Schedule of Tests etc where do I stand...
Hi Guys. First ever post on a forum so bare with me...
Basically I am looking at applying for my JIB card. I have my 17th edition NVQ 2356 and 2330 level 2. Only problem is I never finished my 2330 level 3. I did the level 2 fine and the 301 and 302 of the level 3 but never completed. Can I...
Hi i completed the 2330 levels 2 and 3 a couple of years ago to the 17th edition and sent off for my jib card which came back with trainee on it.
I have since completed the nvq 3 and want to renew my jib card,but do i need to do the 2382 17th edition exam for them to grade me as a an...
Hi guys
Iv literally just received my official certificate from the NICEIC to acknowledge i am now an approved contractor and domestic installer. I have my activation Code for the site but my question is, how do you go about certifying a Job? I have the Megger software which enables me to...
Ok guys have a question. I have registered with NICEIC. As you guys are aware they need 5 jobs to be assessed. Now my problem is all the jobs I have done have been signed off by a third party. Now can I still show them as my jobs and re do the tests myself and certify again.???
Thanks
I was called to a job recently to fix a lighting fault (insulation guys drilled directly through a cable in wall of conservatory), easy find/fix.... During inspection of fault, I noticed the main house lighting had no cpc conductor and many metallic switches/fittings were in place. The...
Hi
I am having problems filling in the PIR (Schedule of inspection). Any examples on how to fill it in? May be an easier explanations on how to fill in the report? Or may be an example of one that is been completed already?
Many Thanks
what document should be completed after fault rectification work. At the moment im studying and need a little help on this question. Thanks in advance.
Hi All,
Finally finished my NVQ lv3 took some doing its drove me mad over the last few months I would rather do the 2391 again lol but its done now next step apply to JIB for a card
I would jsut like to say a special THANKS to AMBERLEAF as without him it would have been impossible in my eyes a...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc