Hello I hope you are well, I have a question regarding this light fitting (BELL 10361 Retro Vintage Half Lantern - Black, PIR, IP54) on the product data sheets it states the max lamp that can be fitted is 42W is that 42W total or equivalent it doesn't state? So would a 18W LED GLS be unsuitable...
Ok I have a confusing situation regarding some Emergency lighting. I have a string of 2D 28w lights in a ward corridor at an nhs unit which are switched from a nursing station with a key switch next to them. It appears that the key switch only breaks the permanent feed to the Emergency fittings...
I've noticed at my grandparents house that all the MCB's in the consumer unit are all type C, every single one of them. Including the ring final circuits and lighting (there's no fluorescent lights in the house at all). The house isn't that old as well. Maybe about 16 years old. With me being a...
Hi I need some help. I have a 2 x 1 gang 2 way light switches - 1 on the upstairs landing and 1 downstairs. They both used to work to control 1 light but have recently stopped. I have opened them up and messed around and now cluelesss how to put them back! The upstairs switch (2nd Picture)...
Hi all,
I am a practicing electrical maintenance engineer but my background is electrical installation/inspection and testing however im a little out of touch (I do have 18th however!) don’t use it, you lose it and all that.
so my friend has recently had a EICR done ready for the imminent...
I know this has probably been asked a dozen times on this forum but I just want to make sure that I'm doing this the correct way before going into my exam. I got told that in the am2 I need to have neutrals at every switch in connecters. I have never done it this at work hence the confusion...
I need to have an EICR since I am getting a small HMO going, and this is the current fuseboard, seems REG16 one.. I had a few electricians coming around and some say they have to change the board, some says I need to RCD all the circuits, some says they only provide a paper report and some say...
We have an Economy 7 meter and tariff.
There are 2 separate fuse boards and one meter with the dual rate on.
Am i right in thinking that ANY electricity we use at night will be cheaper as the meter has a 'timer' to switch to the cheaper tariff? If so then why is there the need for a separate...
Hey guys,
I'm currently doing my level 3 install qualification and I've been asked by someone to replace an electrical shower unit for them, now from my knowledge I am allowed to do said work as long as the power rating of the shower is the same as the old one and that it doesn't need a new rcd...
Something soo simple... cat 5 I’m heading into my am2 exam next week having never terminated the cable. I’ve searched online and I see different configurations everywhere
I’m confused as the numbers don’t line up with the colours the bottom diagram to the table also I’ve seen pictures of the...
I'm almost embarrassed the bring this up again but the whole thing still coming fuses me.
I head again today, a experienced spark say "iv got part P" when talking about qualifications.
I understand what part P is and I have past my building regulations exam as part of my level 2 however, how...
Am currently extending house and will be installing a smart home system throughout. My builder's sparks will be doing whatever is required to comply with regs etc.
I'm also intending to operate the smart home installation stuff as a bit of a future career change/semi retirement business...
Got an e-mail from an estate agent we look after rented properties for:
"Hi,
As discussed, the tenant of this property has advised that in order for them to have a smart meter installed the meter in the property needs to be changed to a two rate meter.
However, an electrician will need to...
Hi all.. needing help with an old Smith coin Meter. I've moved into a flat that has a £1 coin operated meter that the tenants upstairs use for their immersion heater. This is how it works.. they put in a £1and that in turn runs off my electricity. I have told my landlady who says everything is...
Can anyone advise or explain the correct procedure to carry out the above tests on a megger 1720?
I recently purchased a megger 1720 and thought I would have a play with it at home before taking it on site. When carrying out z tests it give you a choice of 2 and 3 lead hi and low test all...
Hello,
I have fitted a double insulated light fitting in my bedroom with no problems.
I had lying around a voltage tester, now I understand these are very unreliable, but when I touch the fitting with it, it will light up. There's a few other appliances that it'll do the same.
I'd just...
Hi all
I have the 2394 practical exam coming up and wanted a little advice on an issue.
Where the installation is split into two parts a three phase board, which supplies a single phase board. When completing the testing sequence should seperate them into db1 and it's test results and db2 and...
hi there
I'm new to this today but I was wondering if anyone could help,
I have my am2 on Monday and I can wire an ordinary 2 way intermediate circuit no problem but on my precourse the said that I need to take a neutral to every switch using t+e and was just confused to how I would do that...
Okay, this may not be the right forum to ask this question but I figured you guys in the UK are on the cutting edge of political correctness so I'll give it a go.
I had a job applicant send me a resume/CV and on it he states he's 'gender neutral'. I'll be the first to admit I'm not up to speed...
Hi
Ive got a question regarding RCD tests.
If a DB had 7-8 ccts on MCBs all covered by a Main RCD, should we do only one cover-all test on the main RCD, or record an individual RCD test for each circuit?
Other sparkys on my firm have been doing an RCD test for each circuit, effectively...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc