Hi,
Where could I possibly download samples of New Amended NICEIC Certificates, the download page ( NICEIC | Contractor | Downloads) used have them but not anymore.
Cheers.
Just wondered if anybody can tell me the minimum requried experience (time served) to apply for NICEIC approved contractor status and how lkong you need to trade for as a buisness before applying??
Cheers
Mark.
Hi,
I work for an overseas company who are building a process plant in the UK. We are employing a mixture of UK and overseas contractors. For the installation, commissioning and overseeing of the electrics and control systems we are doing the work ourselves as this is our area of expertise...
So, a bit of background.
I had to run a new ring (looped radial for those that don't like rings) and cooker point into a kitchen refurb. Nice young couple with a toddler, house previously owned by a disabled elderly gent. The elderly gent had had a wet room built as an extension to the back of...
Hi Guys
I'm looking for an accredited PV installer to work with on a sub contract basis. The work is in Scotland.
Looking at around 3 installs per week every week
Please send me a private message with a phone contact if this is of interest to you.
Thanks
Tony
What can one do if a contractor they subbed into won't pay?
He has been fobbing me off since mid January.
Speaking to other sparks, this seems to be his trade mark tactic.
How this guy hasn't had his big loaf cracked open yet I will never know!
I sent original invoice recorded signed for so...
Hi all,
This may be long winded so stay with me, also I think it's in the right bit but move it needed.
Been asked to do an eicr on an industrial factory, quite a large building and it's in a bit of a mess, anyway there is bound to be lots of remedial involved. The guy that owns the factory...
If you ask the DNO (Northern Powergrid) about contractor switches they'll send you to Meterplus (a division of NPower) and Meterplus will want to extract £82 plus VAT from your pocket.
However if you find the supplier is NPower or British Gas your in luck.
First find the supplier by...
First find out who the supplier is at Homepage
If you then phone Northern Powergrid you'll be pointed from the DNO (monopoly) to Meterplus a division of NPower and told the cost is above £82 +VAT
However if the supplier is found to be NPower - all your customer has to do is just phone...
Hi there, have only checked a couple BSENs on here before so hopefully this is in the right section.
Checking back through my companies previous certificates, we seem to have a real mismatch of codes, my main interest is the difference between a DCN5 (Domestic electrical installation) and a...
Does anybody know if a subcontractor (i.e. me!) working for a larger contractor (domestic work only) will need my own Part P registration and Elecsa/Napit etc. registration? Or could i be covered under their registration???
Thanks
dave
Hi,
I just need some general advice please. I employed a member that had told me that he was Part P and registered to give out Certificates. I believed the Electrician due to the fact that I see him on a regular basis and he looked genuine with a van etc. The job that he did for me was cut...
Am looking at taking on a job for a friend, involving triggering ten lanterns round his property via a pir across his drive, with the option of an override switch for parties etc. All this after an early morning visit by some ne er do well scumbag.
My understanding is that I would need to use a...
We are a newly established electrical contracting firm based in Dundee. We are in the process of going through MCS accreditation for solar PV.
We have spent a lot of money like many of other businesses out there to get this stage.
As we all have recently learned the Feed in tariff has...
We are a newly established electrical contracting firm based in Dundee. We are in the process of going through MCS accreditation for solar PV.
We have spent a lot of money like many of other businesses out there to get this stage.
As we all have recently learned the Feed in tariff has...
I'm unhappy that I've lost out on a job recently because I priced to do the job correctly and another contractor has agreed to bodge it and scarper. The job is wire some roller shutter doors x 3 in an industrial unit. The board is an old bill rewireable board fed in what is at best 6mm SWA four...
I was called to an installation today following a PIR/ EICR done by a contractor. The contractor had advised the client to have a 3rd phase installed as the existing 2 phases are drawing around 95 amps each on full demand and the contractor has adviseed the client that this poses a danger due to...
Does anyone out there need a hand!
Due to the poor availability of PV system components I'm tearing up my diary!
I'm offering my services as an individual, as I sub out roofing work.
In brief:
C&G 17th edition, C&G test and inspect, C&G photovoltaic,
ELECSA comp persons scheme, MCS...