In 3rd year you are not at college for a basically a year until the fica preparation night classes, I have not worked out dates to confirm it is feasible but I am considering doing the HNC electrical engineering in this 3rd year, I sure the night classes won't conflict with the examination dates...
Morning Lads
Hope everyones having a nice break over the hols, i have been caught relaxing too much and strong armed into completing the endless list of already active jobs. After replacing the abortion of a CU under the stairs to a fancy, hager-high integrity 17th ed to accommodate an rcbo for...
Hello everyone, I need some advice. I am a 61 year old apprentice served electrician. I have been " in the game for 45 years ". Mostly I have been employed by companies in the commercial and industrial side. After a recent illness and a lot of thought I've decided I don't want to work for anyone...
Would love to hear from anyone who is or was self employed.
Am looking at starting out on my own in the new year. Currently employed approved electrician large company do mostly testing for about 2 years.
I am in the fortunate position that I have a sensible mortgage and a few thousand behind...
Agh I forgot how long it takes for my body to get used to my normal routine being changed. Anyways I shouldn't complain 30% loading on my hourly rate.. anyone else doing nights?
Hi All,
Been self employed running my limited company since May. Am away to start doing some sub contract work for a bathroom installed, and they have asked me to let them know which approved body I am with because I am doing electrical testing?
Correct me if I am wrong, but unless you are...
Hello, my name is Tim, I am looking to become an domestic installer doing a fast track course mainly for doing bits in my own home and helping out family and friends.
I do eventually want to become a REAL electrician studing level 2&3 then nvq. All the best to everyone out there and thanks for...
Evening all,
Bursting with pride - yesterday managed to finish off and test my first from scratch ring final circuit, felt like a bloody test when it came to doing the testing but it passed with (almost) flying colours - only thing I had to change was a double socket front as it was a bit duff...
hi, just thought I would introduce myself.
I am currently training to be an electrician on a distance learning course with 4 weeks practical training.
my first year I will gain city and guilds 2382 and 2392 (doing it this way as I need to keep working full time whilst I get my qualifications) I...
Doing a lot of EICRs in London at the moment and I'd say every other C.U. has a ring circuit with no continuity on one of the conductors.
Seeing as the IET see fit to tinker around the edges constantly with the regs, I struggle to understand why these potentially extremely dangerous circuits...
So have any of the bosses on here got the task of sorting anything out for their lads for an Xmas bash and if so what have you got planned.
I've got three lads and upto now it looks like our bash is going to be:
Paint balling in the morning
Go Karting after
Possibly finishing with the Bowling...
Hi guys,
So been in the job for a year now, I have done 1st fixing and a lot of ducting in that time, all in residential new builds.
The problem is my friends & family have been asking me to do jobs for them in their houses (outside lights, extra sockets, 2 way switching etc). I feel like...
Im a qual electrician working as a maintenance engineer i was thinking of joining a body like napit ect so i could undertake notifiable jobs. however i have done a few minor non notifiable jobs and the things i find scare me.
Today i changed a few light fittings but the consumer unit had missing...
Hi guys, been asked to give a quote on testing pull cord facilities in retirement homes but have no idea what the Base rate roughly is for doing this?
Each bungalow has a small main unit (tynetec), bathroom pull cord, smoke alarm attached and the wireless pendant for residents.
If anyone can...
This is starting to get right on my !! Now.
Needed a few pumps in the last few months, which wasn't the easiest of jobs getting like for like. But now I can't get them or any for that. All the pump and motor manufacturers are only supplying single phase motors wdf. Some --- in the EU/ G12 or...
Started of as an Electronics engineer doing domestic TV VCR etc (30 plus years ago). Then moved to TV and Broadcast.
That involved Mains electrics in installations, edit suites and Post Production facilities way way back when things were far less complicated. The mains work I was involved with...
Got a call from a local builder this week, asking if I could come and "have a look at a job". Upon asking what it was he said electrics in a new extension. So, as it was on my way home I called in for a butchers. Turns out it has already been done and he just want's "a sparky to issue a cert". I...
hi guys
Just a quickie, do I need to join a competent person scheme? The company I work for want to use me for occasional electrical work, I have a tester and have used the test sheets from 7671, I want to get more involved in commercial work on the side but do I or my current company need to...
So disappointed with Ableskills. The day arrived for induction doesn't even last 40mins. The assessor doesn't explain in many details , more like he's quickly flicked the pages. At the end of session wanted to ask him more question but he's more into hurry out to the office collecting the fees...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc