edf

  1. happysteve

    Electrician to connect tails after isolator fitted (EDF)

    If there isn't a 2-pole isolator there already, I usually get the client to arrange to get one fitted before I do a board change, either through their energy supplier, or (if they also need a PME earth, or their energy supplier is faffing around) through National Grid (formerly WPD). Every time...
  2. L

    Anyone here do domestic installations for EDF?

    Hello all. I'm just looking for a bit of advice regarding our meter. EDF keep badgering us to have a smart meter fitted, and they recently changed tack and said our current meter needs replacing as they are duty bound to make sure our meter is reliable. I know a smart meter is not mandatory...
  3. M

    UK Smart meter installation possible - main fuse?

    Hi, I have a flat in a rather old building in London. Its subdivided into a few individual flats, and there is a meter board with a gas and electric meter in each flat. My electricity supplier sent someone out a few days ago to fit a smart meter, but the fitter said he was unable to do so...
  4. V

    SSC metering expanation , why cant a smart meter be fitted

    Hi all I have a customer who wants a smart meter .. they are with edf .. The existing meters ...1 day rate , 1 off peak ..plus mechanical time switch are placed in the customers porch behind a panel rather than in a meter box ,.. circa 1965 I guess. In order to upgrade the consumer unit we need...
  5. C

    EDF meter change fault

    Hello guys EDF came out to a flat and attempted to replace the meter. I have been called out to investigate there comments which are “unsafe to remove meter, possible borrowed neutral, voltage at meter even with fuse removed (dropped neutral test)” First off i am currently on site, I removed...
  6. rustynails

    Dual supply isolator and EDF

    Hi all, I am being irritated by EDF at present. Last week I phoned them and asked them if they would be supplying a double pole isolator into the meter box between the meter and the consumer unit. They said in my area, Plymouth, it was our responsibility to fit a double pole isolator for the...
  7. T

    EDF coming to connect new meter at temporary site.

    Looking for some technical advice Regarding having EDF coming to connect a new Meter for a (3yr) Temporary TT System supply. The connection was refused at first and he left a sheet with 2 points. 1. "earth rod" - (this has been sorted now) I've installed an earth rod with clamp and 16mm earth...
  8. D Skelton

    UKPN or EDF???

    So I've just been to a call out, customer reports a smell of burning before loss of power. I ascertain that one of two main fuses has gone and there is a slightly charred look about the old VIR cable as it enters the second service head in the flat. Both fuses sealed and I'm not going to start...
  9. A

    EDF commissioning new supply

    Hello all, I have just passed my NIC assessment and am waiting to get my certs and registration number etc through. I need to produce a cert for a DB I have installed at a premises that has had a new supply and is waiting to be commissioned by EDF. They require a test cert before energising...
  10. Rockingit

    EDF refusing to fit a meter until signed off?!

    Have a builder client desperate to get some temp boards into some new builds just about at the electrical first fix stage, DNO have put the supplies in but Eon (subbed to an EDF fitter) have refused to fit meters until the whole lot are finished which is clearly ridiculous. Anybody else ever...
  11. G

    EDF not recieved paperwork, but FIT application.

    Customer just rang, was at work so not got all info, but the jist is he said there was a problem getting his FIT payment as EDF say they havent recieved the paperwork, i think they have received the FIT application forms because i emailed them, i think its the PV commission sheet and Electrical...
  12. D

    EDF FiT payments

    I sent them my meter reading last Thursday, 27th, and got an email today to advise that the credit will be in my account within five working days of today! Looks like they've finally got their act together.
  13. N

    EDF- Glad I went with them.

    Just to inform you that EDF have got their act together. This is my third payment. I sent email with meter reading on Thurs 6th Sept, got notification of payment yesterday - 8 Days !!!!!!!!!!! Seems to be one of the promptest payers at present according to the various forums around. Also to...
  14. I

    Edf energy at olympics - misleading solar pv info

    I have been at the olympics for the last week at stratford and spotted a display with solar panels so thought i'd see what their sales peoples knowledge was like. The first thing i did though was pick up their leaflet 'our solar pv prices are now lower than ever' you could generate up to £713 a...
  15. O

    EDF Feed in Tarriff

    I applied to EDF for a feed in tarriff contract in mid February following my installation. I still haven't received a contract from them although they do acknowledge receipt of the forms. The say they are months behind with the paperwork. Anybody else in the situation? Orty
  16. K

    EDF in the mire.

    Anyone read the article in E&T regarding power to central London during the Olympics? It would seem EDF can’t meet their commitments to supply both the games and the many data centres around the area. It would also seem the data centres are donning their big hobnail boots to deliver a severe...
  17. N

    EDF - Finally get their act together

    After waiting nearly four months for my FIT contract from EDF they have surprised me !! I gave them a reading on March 27th (by post), informed me last week I would be paid soon, TODAY ITS IN THE BANK. Yep 33 days from reading to bank. Keep it up! Just need the sun to come back now ! Good job we...
  18. D

    Update: EDF FiT Applications been processed !!

    Just spoken with the Green team at EDF - they are still backlogged and are currently finalising NOV 2011 - ( target date 23rd March ) They are processing in date order and have thousands of applications for DECEMBER 2011 - so it depends on which date in DEC you have as your acceptance date, but...
  19. S

    EDF strop

    Just had an EDF Engineer do a de-energise/re-energise in West London As he was doing it he casually threw in that all my main protective bonding had to be 16MM. Nice, I'd just routed a 10mm over hill and down dale to get to the gas supply. We had a discussion, quoting regs mandatory/statutory...
  20. G

    EDF energy, what info to send

    Hi all, just filling in a EDF FIT form, been a while since i did one but they dont seem to want to much info like MCS cert, test report, im sure the others wanted all that info or am i wrong. thanks grand
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Advert

TrueNAS JBOD Storage Server

Back
Top