    EDF Fit Deadline

    If it helps: Due to the recent Department of Energy and Climate Change announcement, we need to receive all posted documents by Special Delivery on or before 9 December 2011 to: EDF Energy, Green Energy Team, Osprey House, Osprey Road, Sowton Industrial Estate, EX2 7WN or via email before...
  2. SolarCity

    EDF Feed In Tariff form

    I wonder if anyone has a copy of the EDF feed in tariff form that they could forward to me? Finished an install for someone that doesn't have a computer and I told him that I would get hold of the forms for him. Unfortunately, I can't seem to download the forms off the internet. I have...
  3. S

    EDF FiT Form

    Can anypone e-mail post post link to an EDF FiT application form. Got a job needed tomorrow but the robot at EDF says will only post and should be with you in 3 working days. Talk about trying to detract people from signing up with them. Works I suppose. Thanks
  4. Rockingit

    Interesting chat with EDF meter man

    Edf chap out on site earlier to do some moving around, and I asked him (like you do) if he was going to fit an isolator for me. "Oh no" was the reply, "we can't do that anymore as it's the right side of the meter, therefore the customers responsibility, so comes under part p. And we're not...
  5. A

    FiT application: Impressed with EDF

    Had my 3.92kW system commissioned last Thursday. Spoke to EDF on the phone last Weds, they then emailed me the application form. Was advised to fill the form out completely and correctly or it will risk to be rejected and delayed! Duly filled in the application form in rough on Friday once...
  6. D

    External Earth Problem - fight with EDF

    Hi guys wondering if you can help.... Just done a inspection today, and found that the installation has to external earth supply side. I rang EDF and they came out 4 hours later to tell me they couldn't help, and told me that this area doesnt have earth within the supply i.e TN-S or PME. he...
  7. R

    UK Power and EDF

    Evening all, Phoned edf a couple of days ago about a meter that was falling off the back board in an external enclosure. Anyway EDF put it down as an emergency, bloke came out today, said he would have to ring uk power to change the chipboard and service fuse head, then he would come back and...
  8. G

    EDF Energy Renamed.

    As of the 1st November the name EDF Energy will no longer exist, instead it will be called UK Power Networks as it has been sold to CKI. UK Power Networks - Energy distribution in the UK Best of luck to those involved getting any kind of response from them regarding any electrical queries...
  9. R

    WHY EDF saying no go to meter change !

    One for you guys...i been on commercial property, 3 shop fronts opened out into one estate agent..No10, 11, 12.....Now 10, 11 have incoming supply from edf and 12 has its own supply from edf.. 10 and 11 used to have flats above but now offices.. No. 12 still has falts above and at side... With...
  10. C

    tut tut EDF!

    Last week i was 2nd fixing some houses which was a block of 4. the site foreman came in and told me that EDF had put the meters in last week. I carried on for a while and just thought id check to see what they had done in the meter box. i couldnt believe my own eyes that they had only connected...
  11. C

    Whats the process with running a new electricity supply from i.e EDF to fuseboard?

    Just wondering what the whole procedure is? What are the rules and regs associated with this etc? Whats the situation if your having a single phase or three phase board? Thanks in advance. :) John
  12. S

    EDF / Henley block

    EDF will be coming to connect their new head. Iv supplied them with 25mm meter tails with 16mm earth. The mainsboard is less than 2.5m away from the new meter box. Iv terminated the tails into a 100amp Henley block plus an earth block, fixed on the wall. Is this ok? I couldnt terminate it into...
  13. L

    Pricing for SWA and EDF prep work

    Hi there I have been asked to put a quote in for the labour on running Armoured SWA cable to 6 flats and landlords supply (7 all in all). There will be about 160 meters of 25mm SWA needed (Roughly). Ryefield three phase board installed. Glanded and connected to 6 consumer units, walls will...
  14. mattyhop

    EDF connection

    Hi All Does anyone know where i can download a test cert so that EDF will connect a new mains and meter. cheers
  15. M

    what the EDF Substation Awareness/Competent Certificate is???

    hello everybody I have seen this advert on gumtree Electricians Required Must Have Lul Entry Permit And Edf Substation Training Surrey Quays Tradesmen Labour jobs London and I just wonder what the EDF Substation Awareness/Competent Certificate is? do you have any idea what kind f...
  16. P

    Who's right EDF or me??

    I will apologise in advance for a rather long first post but this has really (NO SWEARING) me off today. Been doing a 400 year old barn conversion. Had to have EDF do a new mains install comprising of a 3 phase 100A PME supply. This involved major underground ducting work due to the overhead...
  17. C

    EDF meter connection conundrum

    Anybody else had problem with EDF regarding meter connection.? Always worked with Western Power & Distribution guys never a problem. Meter guy demanded a BS7671 certificate before connection, check out this EDF document in the freq asked questions section...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top