Hi Guys,
Ive been looking at the JIB technician grade, it says the 'City & Guilds of London Institute Electrical Installation Work Part III Course Certificate (or approved equivalent)' is required
I cant seem to find any details/info on this course anywhere. Does anyone know if it has been...
Hi guys,
Just been asked to design a fire alarm system for a 4 storey building.
Toyshop ground floor
Hardware store 1st floor
Rental flats 2nd and 3rd.
I have installed a few alarm systems, but never designed one.
Am I right is saying grade a,
With a sounder per floor and alarm in...
What do you guys think out there? in my opinion the EPC level of D and the 21p Per KW hoour are bang on. Prices are falling fast on gear and i can really make this work, even starting to feel a bit more confident on spending more money on advirtizing/vans. I just hope the Goverment doesnt mess...
Hi Guys, I have been asked to fit some high level sockets on a Grade 1 Listed Church, but not sure on the regs for that as I mostly do domestic stuff.
It has not been touched for years and does not have an RCD C/U, and they want 5 sockets quite far apart and over 3 meters high.
So my question...
Hi,
I have wired an extension on my dads dairy that is constructed out of food grade panels (sheets of insulation sandwiched by sheets of metal) and am wondering if these need to be main bonded. The sheets of metal are covered in an unconductive material that means there is no continuity...
Hi. I would appreciate if someone could give me some guidance on the JIB grading system as i have had no help from the JIB!
I have the following qualifications 2330 level 2,3 17th eddition, AM2 NVQ level 3 in electrical engineering maintenance.
I have contacted the jib to see if they have...
Right as you probably know all the JIB titles have changed, again.
Part of me likes the masses of definitions, but my question relates to what do they mean?
One in particular.
Provisional electrician.
Can a provisional spark work on site unsupervised, or does he need to be watched like a...
Evening Chaps...
Anyone come across this before. With a grade 2 listed property are they VAT exempt on any building (electrical) works carried out, the builder seems to think so.
Many Thanks,
Sy
Hey everyone, im a recently qualified industrial spark and considering working in australia for a year or hopefully longer! However, im confused as to what exactly i have to do in order to have my British qualifications recognised in australia. Ive searched the web but im not having much luck...
hi, could anyone tell me what other qualifications i need to apply for an sjib electricians grade card? I have my 16th/17th edition city and guilds, ecs health and safety certificate and pat testing certificate. I also have 14 years experience which can be verified with my c.v. I am currently...
hi guys could someone help with identifying what JIB grade i would be able to get with my current qualification as everyone seems to have different opinions on the matter, i currently hold.......
17th eddition
2391
NVQ L3
2330 L2 & L3
just been layed off so need the card instead of paying for...
Evening Chaps,
Got to install a couple of grade D, LD2 systems in rented student properties. Council have specified what they want and this conforms with BS5839-6.
The question is can I commission and sign these off myself ? Don't think there is any reason why not, have checked my liability...
I've recently a 4 year electrical apprenticeship and and contemplating heading over to the uk in search of work. A lot of the jobs I have seen advertised state that the employee needs to be JIB approved.
Can I automatically get my Irish qualification recognised over there or do I have to do...
hello all there,
I am an old lad that got his technician card and has been out of the installation game since 1999. I want to get back and be qualified to the correct level, the JIB offers no guidance.
Could any of you suggest the best course of action?
HI...ive completed my level 3 2330 and the 17th edition. doing my 2391 in september.does anybody know if i was to apply for a jib card now. what grade would i get? ive been doing electrical work for 5 years now. thanks for your help.
heres the list of quals i have:
· City&Guilds 2391-10 Inspection, Testing and Certification of Electrical Installations
· City&Guilds 2382-10 17th Edition Wiring Regulations
· City&Guilds 2377-11 Management of Electrical Equipment Maintenance...
In its simplest terms:
The building is a 3 storey mid terrace house. It has been split as to provide 6 self contained flats (2 per floor). This was done over 25 years ago.
Ground:
Flat 1: Living room / kitchen / bathroom
Flat 2: Entrance lobby / living room / kitchen / bathroom / bedroom
1st...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc