going to add few extra sockets tomorrow morning in a hotel. they have had some renovations and where the till stood was 2x 4way extension leads all ka -jumbled together. and yes wired straight from mcb into extension lead no.1
i
i said to the guy...
Been trying to locate a manufacturer and/or supplier of magnetic key fob switches, but can't seem to find anything i'm looking for.
The scenario is this, ..I have a rental 2 bed villa on a complex in Cyprus, that i rent out to holiday makers during the season. The couple looking after it and...
Thinking of putting these i the kitchen at home, thought this may be a good place to ask about what people who have fitted / used them think of them.
I'm thinking of getting the Natural White, but what do people think?
Installed a addressable GST fire system in a hotel, the hotel has 50 flats on the rear of the premises that also require fire protection.
Can I just put interconnected part 6 system in each flat (not connected to my part 1 system in hotel) and just have my part1 in the corridors with break...
Hi,
I have been invited to prepare a quote for a building which used to be an agricultural building. It has a 3 phase supply so a can easily take a 10kW system.
The owner of this building owns the hotel literally across the road from it.
At this point I don't know if the building has a...
Hi guys want to pick your brains, been called to test and check out a small hotel consisting of 17 rooms that has been re wired by 2 new so called sparkys fresh out of apprenticeship to find that the whole building is wired off one phase of a 3 phase supply, they didn't issue installation...
started a periodic inspection on a hotel today to find out the Ze was 2.8 ohms which now means that a lot of my Zs values are above what they should be. a PME connection is rquired but if the installation has to be bought up to 17th edition (as it is in domestic situations)before the SSE will...
Hi, I'm pricing a job for a hotel roof. I've just come to do the SAP Cals and I'm not sure on the FITs. I'm pricing for a 4KW and a 8KW installation.
Are the FITS the same as domestic?
Hotel extension built 1989 multiple boards each serves 2 rooms,heat, light, sockets, telemetry controled heating from reception, parent board supplies sub via 4mm SWA on a 32A type 2.Sockets 20A b curve, heating 10A b lights, 10A b, sockets are ring final in 2.5/1.5 It's my understanding that...
http://www.youtube.com/watch?v=E76uJi744Do&feature=player_embedded
I've got to say thats Very impressive and makes UK builders look Lazy lol although the Health & Safety on Chinese Construction sites looks non existent :p
We have been carrying out the testing of hotel rooms for a new build project. We were given the order for the whole project. In the last week we have found out that a number of rooms which we knew were not tested have been let out to the general public. We have stated to the client we will have...
Ok lads I'm looking to book a holiday to Greece shortly, in particular a small town called Lindos. Does anyone have any experiences of Greece or any reccomendations?
Cheers
Hi guys just looking for a bit of advice. Just started a periodic test of a hotel, so far I have found the installation to be in quite good condition. What percentage of the installation do I have to test? I have read in guidance note 3 that you can do sample testing which is just a percentage...
Stephen Jupp, 40, from the Newhaven area, died at a hotel in Paris in June 2006, hours after watching a Robbie Williams concert with June Saxby.
Read more at BBC NEWS | England | Sussex | Hotel shower electrocuted tourist
Regards Luke