  1. P

    first periodic inspection report

    Hi just trying to clear a question up,reg134.2.2 states the designer makes the recommendation for the first PIR to be done. GN3 page 19 2.5 says the inspector is the person to recommend the first PIR, which one is correct?
  2. S

    Sealed Meter ?

    In MCs metering guidance version 1.0 it says. . 5. Sealing The meter and terminal cover should be sealed to ensure the customer cannot access either. So do we have to seal the FIT meters we install ? and how are you guys seaing your meters and are you using old meter fitters crimps and seals...
  3. N

    Notifications - Local Inspector?

    Hi all, I am looking to have some work done in my house: - Install extractor into ensuite - Change from ceiling rose to spotlights in ensuite - Change from ceiling rose to spotlights in lounge - Change from ceiling rose to spotlights in kitchen From what I have read, the ensuite...
  4. M

    niceic assesment tomorrow!

    Hi to you all, got my assessment tomorrow and i was just wondering if there was anything in particular i should watch out for?Its for...
  5. D

    Shower isolation

    Went to a friends house today. Apparently they recently had a PIR at the request of their Landlord (Council house). Haven't seen the report, but from what I was told, the inspector apparently had to by law, disconnect their electric shower, as there is no local isolation. The only isolation...
  6. H

    NICEIC Certification Scheme Questions for niceic inspector

    Hi all. Company I work have their annual niceic inspection in a few days time. This usually involves him being shown around a few of out sites. He often visits mine and I always seem stuck to find things to ask to impress him or seek his advice on anything in case I sound daft. Any one give me...
  7. P

    NAPIT Certification Scheme Help ...Part L requirements and NAPIT inspector

    Hi,pulling hair out here I hope someone can clear this up for me as I have the inspector coming from NAPIT to visit the install. To put it short, Existing building,existing extension,Extension had a fire,I rewire new feeds back to the board.Install 11 fire rated downlights 2 outside lights,1...
  8. E

    Heat alarm

    i am just rewiring my house and am unsure about putting in a interconnected heat alarm along with the 2 smoke alarms. I have totally refirbed the property so am thinking i need a heat alarm in the kitchen. In the british standard and the regs it says this can't be mounted DIRECTLY above oven...
  9. P

    Health and Saftey Inspector Prohibition Order

    Hey guys.I've just had a HSI prohibition order against some of my onsite temporary electrical installation work. The crime :- Terminating an armoured cable fed from an RCD into a 45A PVC Switched Fuse Unit without a gland and using an earthclamp to bond the cable armourings via a 4mm Earth...
  10. D

    Height of light switch

    Hi Guys, Just a quick question regarding the height of a normal light switch. What is the regulation regarding the min and max height of the switch. I have noticed in new build's they seem to be quite low. Is this for disabled people?, What is the min and max height Thanks in advance

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top