Hi All,
Being much newer to the domestic market I want to make sure we get things spot on.
When doing works in a domestic property such as a new circuit or in the biggest case a rewire how far to you go with regards to design and paperwork of it?
Should each circuit be designed and paperwork...
Hi good evening
i applied for access about 2 weeks ago and still can't gain access just wondering is there anything else I have to do any help would be great :smile:
regards
adam
Hi again
Getting certs together for my first Elecsa assesment.
My project was a CU change at my brother's flat. Notified building control as advised and completed, tested, energised and filled out the certs. All good.
Building control came and inspected the work and advised on some further...
Hi Everyone,
After some recommendations as to where to get some duplicate books done such as small works jobs sheets, call outs etc?
Am NAPIT registered also & although do my certs on PC, would be handy to have aduplicate test certs book to do on site, am aware can get from NAPIT but ideally...
Hi. This is my first time on this forum (on any forum actually). I hope someone's out there.
I'm applying for my registration with NAPIT and along with all the other oudles of paperwork I seem to need they expect me to have a "system identifying responsibilities for safety, quality and...
Customer just rang, was at work so not got all info, but the jist is he said there was a problem getting his FIT payment as EDF say they havent recieved the paperwork, i think they have received the FIT application forms because i emailed them, i think its the PV commission sheet and Electrical...
Customer has had builders in (nearly finished), taken down internal walls and made extended kitchen space. Various circuits loose, and dangling off cables etc.
Customer wants quote for the kitchen which is now concrete and old plaster.
20 minute first visit confirms 16th ed’n board...
Guys,
we have been asked by a customer that has had an install done but the company have went bust.
We have looked at the job at it meets all install criteria. we are aprehensive about the legals.
what implications would there be if we signed off.
regards
wiggly
Speaking to someone recently who's recently had an EICR done on a 3 bed detached 1970's, they wanted my opinion on a couple of things. I ended up asking out of interest how long it took. They said two of them turned up and half hour it was done! To which i replied no chance. I said it must of...
Hi we are quite a well established company in our area, started up on my own around 10 years ago and do fairly well.
However, my biggest downfall is the paperwork, I just cannot get systems in place that work (or that I can keep to). I find it extremely difficult to book work in and keep to...
Hi
Just wondering what paperwork you all issue when replacing a consumer unit, I've been issuing an EIC and a schedule of test results I normally print them of IET website but I was just looking through their amended forms and was wondering if I should also be completing a schedule of...
Morning all,
I'm bored, everyone's out and I'm catching up on some bits and bobs!
I've been toying with the idea of doing my own letterheads, invoices, job sheets etc, for a while. I want them to look professional, possibly use logos for NIC, Safe Trader etc, and of course text. I also want to...
Hi
Just a question here regarding testing and certification.
If you got called to a house to replace a socket that had its casing cracked or you put a lovely new B&Q chandelier up for someone would you then do a minor works Cert + Si + STR?
Seems a little overkill to me
If you don't what's...
Hi
I'm an MCS (NICEIC) and REAL accrecredited PV installer. To date I have carried out a number of installations from start to finish i.e. providing materials, fitting panels, commissioning etc. This means I have also done all paperwork from the initial quotation and contract to commissioning...
Hi Guys and Gals.
Have been passed some 16th edition minor certs for an installation in feb 2008. 2 of these are for installs in a kitchen. one for the cooker and one for sockets.
Question 1. Was a Minor adequate for a special location in the 16th?
Question 2. What was the requirement for...
Today moved 4 panels for company that had loads of work in the november madness!! well starters WRONG mid and END clamps (too small) cannot tighten to correct torque! (will defo move in couple of yrs) also brackets fixed with 1 screw ! cables and mc4 connectors laying on roof in full view ...
Passed my assessment with elecsa yesterday, assessor chris thomas put my nerves at ease stright away very helpful fella. For those who want to know it went like this, firstly spoke about what experience i had then went through all my paperwork, required a healthy and safety policy and risk...
I carried out a vvisual condition report on a medium sized commercial premises a couple of weeks ago
To cut a long story short the switchgear and db`s were rubbish with shields missing, a cover missing and rusty etc, priced for replacement switchgear which was accepted, as required I tested...
Urgently need someone to do 2 x g59s ( the inverters are g83 compliant ) so I will sneak them through dno must be completed prior to 12 noon friday will pay cash mark 07866 777 474
Can anyone who has installed a 3 phase system using 3 x separate inverters across the phases please advise what they entered in the registration forms? My installer is not absolutely sure as there are effectively three PV systems bolted together and I want to make sure it is spot on without...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc