  1. Pete999

    Does Part P need Reform?

    Not sure if any of you have picked up Septembers PE yet I was out shopping and picked up a copy fro an Independent Wholesaler. I am passionate about this issue and have received several " Old, Dumb, Dislike or Disagree markers for my threads", but hey I have broad shoulders, so no worries there...
  2. C

    Removal of extraneous conductive part

    within a building supplied my a PME system it’s not possible to main bond the extraneous conductive parts effectively back to the origin. Resolution instead of changing to a TT system remove the extraneous conductive parts. Water pipe: this comes out the ground so change this to plastic and...
  3. D

    Another Part P Question

    Hello all, Bit of background before I jump into the query to try I'm a qualified electrician by trade, completed my apprenticeship with a large commercial contractor through 2007-2011 and worked as a subcontractor, for around a year, before being fortunate enough to jump into a design office...
  4. gazdkw82

    Part P ...................

    I'm almost embarrassed the bring this up again but the whole thing still coming fuses me. I head again today, a experienced spark say "iv got part P" when talking about qualifications. I understand what part P is and I have past my building regulations exam as part of my level 2 however, how...
  5. A

    Question about part p scheme

    Hi guys i am fully qualified time served electrician with a jib gold card. My question is that i am almost going to be registered with stroma and was wondering if in the meantime i can carry out part p notifiable work do the test and fill out the relevant certs. And then after my assessement...
  6. Zdb

    The part P doctor (25 characters)

    What the? The new Part P Doctor Part four download. | eBay - https://rover.ebay.com/rover/0/0/0?mpre=https%3A%2F%2Fwww.ebay.ie%2Fulk%2Fitm%2F253701170898
  7. M

    New build part p ans being registered

    Hi all My in laws are having their new build wired bur the company are not part of anybody such as nic eic They are on about self certifying their work and noy notifying building control....is this possible? Or would building control need to come and have a look?
  8. M

    Part P assessment question

    One of the questions on a recent Part P assessment was how would I wire an external outbuilding if the earthing arrangement to the property was PME. I said I would run a three core SWA from the property to the outbuilding and use the cable armour and the third core as the exported CPC. I was...
  9. sham

    Lost out to allot of work trying to follow new ever changing Regs, Part P etc

    I have been asked on many occasions to add lights and sockets to an existing installation. When I tell the customer that I must change the MCB to an RCBO and then carry out a minor cert which all adds to the cost of the job, I know that he has called someone else who will just extent cables...
  10. littlespark

    Part P without joining a scheme?

    I have a possible job coming up where a neighbour of mine in Scotland is buying a property in England. Its a flat, and he thinks it needs a full rewire. Until I've seen it, I cant say what all needs done. Since starting self employed, I haven't joined a scheme yet as the costs are too much at...
  11. S

    Passed Part P assesment

    So yesterday had my stroma assesment and happy to say I passed. Would like to thank everyone who helped me in the last few weeks. The fun begins
  12. kingeri

    Extraneous conductive part as bonding conductor

    Been nosying about at my brother's new house this week and fixing a few bits and bobs. The electrical installation mainly dates back to the early 80's at a guess and apart from a few broken accessories and a lack of RCD protection (now fixed) it has all checked out okay. PME earthing. Today...
  13. S

    Part P scheme any tips please???

    Hi I am new to the forum so thanks in advance for any comments. I am qualified to level 3 2330 and 17th edition, and looking to join a Part P scheme probably (Stroma) to start out on my own mainly house bashing etc... The problem is that I have had a fews year off and feel like im not ready for...
  14. Christopher Price

    Looking for part time work in the Bridlington area

    Hi, I did my apprenticeship and started off as a shop fitting Electrician in the early 1980's. Then worked for BT for 30 years, just retired and decided to qualify for my ECS card. Experience in comms including Broadband, loads of safety courses EUSR, Streetworks etc. Looking for some part time...
  15. A

    Working part time until I get nvq3??

    Hi guys Just want people's views if what I'm considering doing is doable I am wanting to get my nvq3 but currently out of the trade . I have got previous experience - 8 yrs and c&g 2360 parts 1 and 2. I want to do 2 days a wk electrical as a mate/improver so I can get my nvq3 Either working...
  16. C

    Hi all. Help on part P required please.

    Firstly hi everyone. I am an electrical engineer in the manufacturing industry. I hold the BS7671 17th edition certificate and have a HND in electrical engineering. My confusion is as follows; We are having an extension built which is going to be a family room added on to the existing kitchen...
  17. R

    Annual emergency lighting test in part disused building

    Hi all i was hoping for some advice, I am carrying out an annual emergency lighting test tomorrow in a hotel. Part of the hotel is no longer in use and all supplies have been locked off. Should this part of the building still have emergency lighting in place in case emergency services need access ?
  18. M

    The ins and outs of part p

    Hi guys Im at a loss here my understanding of part p was that if you were a qaulified electrician you had to do this to be able to sign your own work off as this is what i planned to do once i qaulify. But is it possible for anyone regardelss of electrical training or experience to get it?
  19. R

    Am2 exam live testing part need some help please!

    Hi everyone, My resit on my AM2 live testing is monday coming and I need some help/ gudiance on anyone who has sat theres to help me. Confim polarity by measuring the voltage between each phase to N and each phase to earth, then phase to phase to ensure I am getting 230/400V etc. So then, Ze...
  20. J

    Part P non notifiable

    I’m currently undertaking my nvq after passing my level 3 electrical installation course, I’m looking to do small work for family friends etc but would like to know what jobs are non notifiable according to the part p regulations. I have tried looking and found various different answers and...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top