photo | Page 3

photo

  1. M

    Is this considered OK, see photo.

    Currently got a half finished job over the weekend (due to freezing conditions which slowed work progress) so I've had the chance to take a look a the work so far- partly cause I have some other roofing work to complete whilst the scaffold is up. Please look at this photo and tell me if this...
  2. A

    Steinel photo sensor for outside lights

    Hi all hope you can help can you wire up a steinel sensor for outside light and have an over ride switch if so how do you wire this up many thanks
  3. trypod

    The New Megger MFT test leads

    Hi has any body used the new leads yet? ImageShack® - Online Photo and Video Hosting
  4. W

    I got the job!

    Some of you may have seen me scrabbling for advice last week in regards to a re-wire i was asked to quote for. Well i got the job! Very pleased. Am now however bricking it. Start work this friday. If you dont hear from me by the end of next week...fear the worst. :svengo: 25 sockets, 23...
  5. K

    RCD protected?

    Hi guys, I need a little advice - have attached photo... I need to upgrade this fuseboard to Current regulations - customer cannot afford to replace CU with 17th edition split load board. can I move the RCCB to next to the main switch to protect all the circuits? Or can I add another RCCB...
  6. A

    photo cell and 2d fitting

    Hi I have fitted an outside light will a photocell for an office. I have wired the line into L terminal neutral into N and line out into LO which goes to light fitting.For some reasom it is not turning light on when it gets dark, was wondering if fitting would cause this. Any ideas
  7. T

    NICEIC Certification Scheme NICEIC email on publicity campaign

    Just got this email today: http://enews.niceic.com/rp//333/process.clsp?EmailId=112579&Token=28699C6255E955A1BF8A27E74199C0853 Now is the concern here safety, or just marketing?
  8. P

    Photo

    Thread #14 on show us your installs whats wrong with photo looks all ok to me couldnt find out how to post next to it so depending on this thread to tell me whats wrong with it
  9. D

    Help with diagram please

    Hey guys, i am a 3rd year apprentice doing an assignment from home, im drawing a ring circuit with socket and spur, trying to figure out how to draw the spur, can someone help please? This is what i think it should be, with supply going in and out, nothing on the load side is drawn in the...
  10. P

    Light via photo cell and timer and contacter help Please!!!!!!

    Hello all I am a little confused,here is the short story I have been to an electrical fault on some Arms Houses there are 11 outside lights all have 2 flourscent 9 watt lamps installed there is a time switch a photocell and a contactor installed but they have stopped working Please correct me if...
  11. Paul.M

    Help with avatar photo

    I've been looking on the net for a photo of the new up coming film PAUL with the alien. What I want as my avatar pic is the films promo shot of the name Paul with the alien eyes in the letter A. If anyone comes across it post up a link or pm me. I know its a long shot but how often does a...
  12. B

    JIB Grading card

    Just got a letter from the JIB reminding me I need to renew my card. Thing is there is a part of the form that needs endorsed by a JIB company. I no longer work for a JIB company and just recently went self employed, so does this mean I cannot renew the card?
  13. M

    see photo and reply please

    i took this out of a hot water tank that has 3 x 20kw heaters. the tank is 10 months old. wat is the cause of the scale build up and wat can he do to stop it. its in a hair salon.
  14. S

    photo studio 3 phase board with no rcd protection

    Im inspecting and testing a photo studio where there will be staff working there. There is a 3 phase Distribution board with no RCD protection. Do all the breakers have to be changed to RCBO's
  15. R

    A pleasing photo

    5X work shirts (1 out of shot) washed and on the line = 5X days of work last week. 5X work shirts washed first thing on the weekend = 5X days of work next week. Hope this is the beginning of an upturn, and not just a one off. Also hope things are looking up for you lot. AND the sun is shining...
  16. M

    Lcm, booster, photo cell key switch

    Hi Done tube work wired lights and photo cell, the key switch, Lcm and power booster done by another guy, switched on lights ok but they are very dim and take 1 hour to warm up, photo cell not working? Around 13-14 lights on a long run, if the lights were from the board via a key switch things...
  17. M

    Kitchen photo - is the installation correct?

    Although I am a trainee electrician I still work with refurbishments and my supervisor sent me to the companies other site to finish some work and this is what I found in the kitchen (see the picture) is the installation correct? i am not saying what I am suspicious about (I am not even 100%...
  18. S

    J.I.B NICEIC part P card!!

    Hi sent off my application form to the jib for the jib niceic part p card approx over three weeks ago and it now has just been returned to me minus the jib part p niceic Card due to the niceic assessment report not being sent to them:confused:????? Certificate of niceic registration was sent...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top