I need to protect a digital welding inverter from voltage spikes when powered from a generator, iv'e been told running it through a transformer will do this, however the welder is 240v and the only transformers i can get at a sensible cost are 240 in, and 110 out site transformers, i could get...
Hey guys, I was wondering where if in the BGB or if you have any links you could find some of regulations regarding working live, when you should etc.
As an apprentice, I have already had to work live, so was wondering what the guidelines say about it, the necessity to work live and what should...
Hi guys, I am a domestic/commercial sparks wanting to get into industrial work. Will having compex help me to get into this field or am I gonna hit dead ends even with compex due to inexperience. Any advice would be great thanks.
Hi,
does anybody have experience of dealing with tool hire companies in the North West, in particular what levels of discount can be achieved for 'regular' customers.
Apologies for some laziness (I should be ringing round) but I thought I'd get some views from this forum first.
Thanks
Just out of interest really, how many of you guys have ever come across / worked in the above mentioned environment? i personally trained as an installation electrician as i guess the majority on this forum have, again i personally prefer working on control systems and maintenence > installation...
theroadblock
Thread
control
industrial
maintenance
plant
systems
working
Hi All
This is my first post on here so thought I'd introuce myself, Im 27, a first year Adult Trainee in Scotland and really loving my new career as an Electrician. I came accross this forum via one of the guys from college.
As i've just started out im in the process of building up my kit...
Scotsman84
Thread
batteries
cordless
drill
makita
plant
range
sds
second
In a gas power plant There are 2 main transformers ( st1 , st2 ) taking from the grid 380 kv and step down to 13.8 kv ,and then feeding the main bus which it is divided into 2 buses ( A Feed by st1 , B Feed by st2 ) between them bus tie
st1 = 380 kv/13.8 kv
st2= st1
Bus A feeding gas...
live11
Thread
aus
avoid
building
calculate
compressor
feeding
gas
how to
plant
starting
voltage
voltage drop
volts
Any of you on continuous plants will know this senerio
At Christmas production and maintenance would work 6-2 only. 2-10 and nights would just have production skeleton crew on. But if it was you due shift and you were needed you had to go in.
Christmas day was special, I didn’t mind going...
Knobhead
Thread
canada
christmas
electrical work
plant
roman
times
work
Dear All,
I need a help If some body have a document about for training purpose GE Janbacher gas engine and auxiliries of this plant. I am the technical trainer of the power plant of GE Genbacher. I am waiting a great reply from your side.
Thanks
Hi,
now days i'm searching for all norms which have to be taking into account during the conception of photovoltaic installation.
Considering that G59/2 applies for an installation, i'm wondering if the guide "ER G59/2 : Recommendations for the connection of Generating plant to the Distribution...
yves
Thread
apply
documents
guide
photovoltaic
plant
power
systems
volts
How many out there are ensuring that their plant carries a valid label and not one that's been made up (not suggesting anyone would!)
As most will be aware site plant requires 3 monthly tests.
Who hasn’t come out with some of these statements at sometime?
This is fool proof
They can’t break this
There’s no access to the work area while the M/c is working
Everything is cross interlocked
That can’t happen it’s physically impossible
I’ve checked everything
They’ll never defeat this...
Knobhead
Thread
canada
electrical work
never
plant
program
roman
times
doing a PIR today and reached over the plant on top of fridge to find that it was a cactus plant and it attached its self to my t shirt and fell on to me before i realised what it was i had been injected with about 40-50 spikey things with barbs!!
Gents. Doing a swimming pool plant Monday. Going to be doing a bit of fault finding to find out why it's not working.
If anyone's had any experience here before I'd appreciate it, anyone familiar with the types of pumps and motors involved.
Thanks.
We're pretty rural and I've had several requests lately for field based solar farms. I understand in theory the following....
Enquire of DNO - Can we site a solar farm here? Contestible and no contestible costs
Farmer will need planning - What does he need to submit with planning app, a...
Ramjam
Thread
design
farm
panels
planning
plant
solar
solar farm
Does anyone know where I can find the answer to this question?
What are the regulatory requirements for storing tools, plant, access equipment and materials?
Cheers
Hi looking for a few pointers.ive been asked to move an existing setup up involving four production machines to another unit.Ineed to ensure that the new unit has the capacity to run the plant with no issues.I'm looking for some general advice please.
The way i was going to approach it was...
Hi Lads;
The Koreans & the Amercians are building a new electric power plant in Kuwait.
See this:
[COLOR="Lime"]
‘Next year, we will get over the problem,’ when the first phase of a power plant under construction will come online adding about 1,320 megawatts of new capacity, the minister...
Hi all
Going to look at a job on monday which is to put the power into the plant room for a friend of mine who is building a indoor swimming pool the main surply is 25m from the plant room and the need a CU in plant room for lights and pool accessories looking at spec the total running amps...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc