Hi guys. I have 2 questions to confirm my thinking.
1. If I perform an EICR on an installation, which was Installed whilst a previous edition of the regs were in place, does it mean that I can give a satisfactory condition providing all test results and observations are correct for that...
Sorry if this is a basic question that's been asked before, but I can't see the answer to my practical questions.
We have 16 panels with a Voc stated as 37.4 - so total array Voc 598.4. They have a Vmpp stated as 30.3 so total 484.8.
We have a SunnyBoy SMA3600TL and it displays the incoming...
I have an installations exam in a few weeks and was wondering if anyone knew where i could find practice questions on things like cable calculations, protective devices and 3 phase supplies for a bit of revision.
All help appreciated.
Alex
So i heard a fellow sparky saying taking L&N to the light switch is not allowed and is classed as bad practice!
Is this true I've found it a good way to keep things tidy when wiring lots of spots etc.
Thoughts?
Hello Gents
Once again I’m looking for your expertise to resolve the following application.
A local supply Authority has supplied a single phase 8Kw TN-C-S supply via a cut out, to which we have to terminate a 35mm2 3 core SWA cable to be buried underground. The cable cannot be easily...
Got a call from a customer with tripping problems on their CU... Went out to see what the issue was: decrepit teasmaid causing the tripping so easily recified, however seeing the current installation made me wonder what decision making had gone on by the installer.
The CU has been in for less...
This is now available for download and comment from here:
Draft code of practice for public comment - The IET
Martin Cotterell of Sundog who has been involved with this has written an informative blog at Solar Power Portal:
Preparing for the upcoming IET solar PV code of practice | Solar...
The Draft for Public Comment stage for the IET Code of Practice for Grid Connected Solar Photovoltaic (PV) Systems is now open, and the closing date for receipt of comments is Friday, 7th November 2014.
The draft document and the comments form for feedback are on the following webpage...
I'm looking for a good book/s on basic motor control design for DOL starters overloads etc, good panel design practice what to include and best practice in design as per interlock methods basic principles etc.
Anyone know of some good literature or websites
Hi there!,i am recently moved to London. I am preparing my 17th edition exam and i have a NVQ level 3 in electrotechnical instalations. I have many questions that i would like some to answer to me. I change we can practice Spanish becouse i am native speaker! we can take contact face to face or...
Hi all,
Completely new here this being my first post.
I have recently been offered a electrical apprenticeship with a local firm.
This is under the condition i pass a JTL aptitude/assessment test.
Does anyone on here have any advice they can give on what to study, what the test will entail...
Hi all, just wondering if there are any websites out there that provide notes on testing and inspecting.
im going to sit my 2394/2395 soon hopefully but have lost my college notes with a lot of valuable info on.
are there any websites out there or do you recommend any books or other pieces...
Can someone please tell me where I can find 2394 written exam practice papers/questions/packages etc... as i cannot find anything anywhere if such a thing exists?
Can someone please tell me where I can find 2394 written exam practice papers/questions/packages etc... as i cannot find anything anywhere if such a thing exists?
Hi, I was going to post in the DIY forum but don't seem to have permission to at the moment. If i could ask a quick question - are you able to offer your opinion on my plan below:
I have a b16 circuit breaker in the CU for a radial circuit out to my garage. In the garage the cable feeds into a...
Hi all
6mm Cable runs from Fuseboard into a 45amp DP swith for the cooker. (Cooker load is 7kw)
Can the cable run directly from the switch into the cooker or does it have to go from the switch to a cooker connection unit and then a cable from the ccu to the cooker?
I cannot see anything in the...
Does anybody know if a full fire alarm system is required in a dental practice?
I am of the understanding that due to the fact that staff are to be employed, a full system with call points and sounders and beacons needs to be installed.
The client has argued that due it being under 100m square...
Does anybody have any information about free downloadable test exams for CG2365 or similar, I am presently trying to locate 2365-202/203
Many thanks in advanced
Newboy
Multiple choice practise software for the City and Guilds 2365 210 exam communicating with others
Hiya.
I took my AM2 this week and passed everything apart from the online exam which is the second to best outcome in my opinion. I gained about 63% (19 marks) which is just 2 marks from a pass, very annoying!
Anyway, Ive been looked ont' net and can't find any practice papers of any sort...
come across this one been stuck on it for ages please help also please tell me how you came to the answer as I can guess the answer but I always like to know how. Here is the question thanks in advance. A periodic inspection on an existing single phase installation which has 12 circuits...