process | Page 2

process

  1. Dobes_88

    New Member - Qualified Fire & Security Engineer, In process of 2365 Level 3

    Just thought I'd introduce myself on here... I'm Jamie, 26 years old from Surrey. Been in the Fire & Security trade for around 6/7 years now, did the college route and gained City & Guilds 1852 Levels 2 & 3 in Fire, Intruder, Access Control and CCTV (Gold ECS Card in installing, maintenance...
  2. A

    process of studying to HNC in electrical electronic engineering

    hit 40 need a different direction wondering what i would need from scratch to do a HNC in electrical,electronic engineering was more electrical installation as an apprentice time served now in more engineering role feel i need something on paper these days also due to shift work have a lot of...
  3. D Skelton

    Age of those who can build a control panel and control a process

    So reading through a few of the recent threads where lack of skills in the industry seems to be the main bone of contention, I'm personally interested in the way that the industry is changing with bias towards the domestic sector. It seems to me that most of those coming out of college nowadays...
  4. G

    Spot Light / Downlighters Installation??

    Hello all, I have got quite a good understanding about electrical installations but have never installed Downlighters? I'm doing a job on my own small living room and want to install new LED downlights; the room currently has a normal ceiling rose in the middle of it and I would like to install...
  5. uksparks

    Consumer Unit Connection Process

    Hi, Just saw another thread where a new lad has posted a pic of his board he is wiring... It got me thinking... When you change a CU or fit a new one on a new build or where ever etc..., how do you go about connecting everything in the board? Looking at the other thread he has taken the...
  6. 9

    process of starting up

    Hi In the process of starting on my own Im in scotland As like all of yous on starting up you are not a member of a scheme like select until you get some money behind you. My idea is build up some work then join one. However i know when doing work for a local builder in fife you can...
  7. A

    The agreed process for signing off third party work....

    According to a recent article in PE magazine. The installer appoints a registered third party certifier. The scope of the work to be inspected is agreed and the work starts. Within 5 days of completion, the third party certifier returns to inspect and test. and issues........wait for...
  8. S

    NICEIC Certification Scheme Certification by the Niceic

    Hi all, was going to buy some software to help with certification and heard amtech and easycert are pretty good but have heard now that the Niceic are going to be doing a pay per use scheme where by we wouldn't own the software or indeed the rights so no up front fees.... Could anyone tell me...
  9. B

    Rewireable main fuse.

    I was changing a consumer unit today and the DNO's main cut-out was a porcelain rewireable fuse inside a hinged metal unit. There were no markings on the fuse-holder, and the fuse consisted of two strands of wire, approx 0.75mm dia each. I'm afraid I haven't seen one like this before. Can...
  10. S

    NICEIC Certification Scheme NICEIC Part P inspection process

    Hi, I am going to be contacting the NICEIC to get Part P certified in the next few weeks (prior to the new changes taking effect on 15 April 2013), but I wanted some advice on what their annual visit actually entails (i.e. verbal and practical testing / checking of knowledge etc). I...
  11. V

    Utilising Renewable Energy: Turning Fresh Air Into Petrol:

    "Air Fuel Synthesis from Stockton-on-Tees has produced five litres of petrol since August when it switched on a small refinery that manufactures gasoline from carbon dioxide and water vapour." "We can convert renewable electricity into a more versatile, useable and storable form of energy...
  12. richy3333

    Wylex product recall - change of process?

    Has anyone heard that Wylex have changed the process for dealing with the MCB product recall? I had to inspect a Volex board yesterday for some proposed works. Customer just moved in to new house. No idea who did the original install just a test date on the board suggesting it fits with the...
  13. G

    Process Meter

    I am looking to purchase an all-in-one process meter that is able to simulate current, voltage and calibrate temperature sensors. I know the Fluke 725 Fluke 725 Multifunction Calibrator | Multifunction Calibrators By Fluke does this job and is the business I'm sure, but comes with a hefty price...
  14. T

    Clarification on EPC process

    OFGEM have published updated guidance on FiTs that includes details of how the new EPC part is to work. Anyone who has followed my previous posts about this will find no surprises - DECC have decided to implement the same exemption process that I suggested they might use. Details are here...
  15. G

    process of removing distributors fuse???

    Hi guys i started another thread about rewiring my house but forgot to ask about the removal of the distributors fuse. I know a lot of sparks who just cut the tags and remove the fuse but what is the process of doing this properly i know a phone call to the DNO will be required but do they come...
  16. P

    G59 Application Process

    Hi guys, I have heard a rumour twice in the last week that all projects under 50kW will soon, if not already be treated as a G83. I know that the rules hve become relaxed under 50kW, i.e I have submitted a few G83 forms to apply for 45KW systems. But I am now hearing that people are not even...
  17. S

    UK Power Networks

    Hi Guys I have the possibility of installing up to a 50 KW system on a light industrial unit in East Sussex. The customer is unsure as to the size of system to install but it could probably be up to 50KW.So far only having installed domestic systems up to 16A per phase and am a little bit...
  18. S

    Process management systems

    We are looking at buying in a process management system such as Paperclip. Do any of you out there use this or an alternative and what are your experiences of them? We are looking for the best value for money. A system that means that muliple people from different departments can pick up the...
  19. P

    dno timescales and process

    What are peoples experience of DNO timescales in their areas? If you are connecting a PV system under G59 regs, the DNO is required to witness test the system. What is the timescale for DNO's to come and do this, assuming that no reinforcement is required on the grid. I would just like to also...
  20. S

    NICEIC registering and assessment process

    Hi I have recently decided to set up on my own and start off as Niceic D.I i have been doing my own work (evenings/weekends) for last 2 years (approx). I also have my 3 jobs ready for my nic assessment (1 x minor & 2 x Major) all tested but im am a little concerned as haven't really been...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top