Hello all, new to the forum and everyone seems to be quite frendly and happy to help out. So.. i have my am2 in a few weeks and am pretty gemmed up on everything but there are a few things bothering me. And have checked all forums regarding am2 prep and can't seem to find anything.
1.When...
So next week I have to add a circuit to this board:
My plan is to add a Wylex breaker ........... but how would the BBB wording cover this?
I haven't bough the BBB yet!
After all, its not me that added the 3rd party breakers:):):):):)
Looking for some advice on what I've discovered is the electrics situation in my rental property.
I'll note that before I moved in here I made the Letting agents (LA) more than aware I use an absolute -----ton of power. I told them I can and will be pulling 2,000-4,000 kWh a quarter (with gas...
I seem to remember whilst at the NICEIC film show (oh by the way I believe NAPIT are doing a roadshow as well, lets hope its better than the NICEIC one, see Julys PE for details)
One of the things I remembered from the very limited information given out, was the fact that AFDDS would not be...
Okay I can see that whatever the case there is no one working with the forum who can stop the spam. Well I acknowledge that clearly you get on to it and wipe it off each and every time it appears and am always grateful you respond so quickly. I realise it must be a chore that you hate as much as...
I had been ti Helsinki on a supply run, and my Boss and hi wife had flown up to pick up their new Volvo Estate, right hand drive for him to export back to the UK when he had finished his Tour of Duty, we were scheduled to drive it back th the British embassy, taking it in turn to drive, as it...
Afternoon all..
Since I started doing this full time a year ago I haven't taken any holidays. A day or 2 here and there, but no long breaks. I thoroughly enjoy the work and when I get home I get on with quotes, certificates, invoices etc and I'm ok with that as I enjoy it. However, it can take...
So i have my College level 2 practical exam on Wednesday and we need to produce a board following a sheet. on that board we need to produce and wire up a 2 way light switch, i have always had trouble wiring up lights and found it very complicated, i have been doing some research on some wiring...
So I'm just wondering what the best practice is on cable entries
If you are running SWA through an outside wall. What is the best way to seal the hole where the cable runs through? Silicone It? but I figure that's not the prettiest. Are there any cable covers for SWA? I understand you can...
Hi guys so found out my house has no bonding today so am straight on it and getting that done tomorrow and getting my incoming water bonded, but i do have a question regarding my boiler/radiators, i have oil from outside come into my boiler to do the heating and hot water.
The boiler is on...
Evening guys
I was asked a question earlier and i was unsure if my answer was correct, I was asked if I could install 3x power showers all 3 are 9.5kw I’ve been assured the water supply is more then capable, the board has a 100amp main switch
My initial reaction was no, it’s way over the the...
Hi everybody,
Will anybody be able to help me out with this question? What are Class I & Class II equipment likely to be in a bathroom/shower room?
Thanks in advance for any advice.
Hi guys need some advise please carrying out a eicr in a commercial propety which has two buildings next to each other but not joined each have own pme supply coming in so treating each separately. One of the buildings has two meters 1 for basement area with communal areas and 6flats the top...
Hi everyone,
I've been offered temporary work through Girling Jones Recruitment Agency at Ikea site in Exeter as an improver. They were advertising it at £10 per hour.
So decided to go for it as it would be good experience etc.
Had an email from them stating "£7.94 per hour (£10.00 per hour...
I have set my heating to come on twice a day but for some reason it doesn't come on when I've set it to now the last set time had passed and the heating should be off why is it just decided to come on even though the timer isn't on I'm confused also how do I set my thermostat to 15 if I turn it...
Hello,
My name is Kieran and I have not long finished college receiving my level 3 electrical installation diploma and I am currently looking for an apprenticeship in the electrical industry.
I am here on this website today because I have called many of companies and I have had no luck. If any...
Morning all..
I am about to quote for a cooker hood installation including core drilling for the vent. The fan is 125mm.
I have checked upon the sizes of core drill bits and 127mm is the closest fit. I cant see the 125mm ducting getting through that due to the outer diameter of the ducting...
Just a thought really, there have been several posts, where Guys have been asking, what type of cable is this, that or the other.
Now is it just me or do members think we are coming to the end of an era whereby some of the younger Electricians/Domestic Installers, have not seen or heard of the...
Some professional advice greatly appreciated here for design and costing purposes - two simple questions.
Background: We've just replaced a 25 year old wooden shed - good service but sagging a little from age and too small for our needs - with a larger one from Beast Sheds Ltd. (Recommended!)...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc