registration | Page 4

registration

  1. P

    Elesca registration

    Hi guys,Just looking for some advice!Basically I'm looking to become registered with the elesca! I'm not worried about the assessment itself!However as I'm newish to the industry although I feel I'm competent I don't actually have any previous work to show them!So I'm in the position that I need...
  2. D

    Registration bodies

    Hey guys, I'm currently reg'd with elecsa and have been more than happy with my dealings with them. They are always helpful and really welcoming with questions. BUT, i have come accross a few jobs where people have asked for NICEIC as its the one they know or have heard of and assume elecsa to...
  3. H

    Part P registration Level 3 diploma minimum for entry 2013

    Has anyone read the NAPIT write-up regarding the minimum requirements to join a Part P scheme in 2013? Just had a little read and it was proposed (as we all know) from January 2012 that the minimum requirement would be a level 3 Diploma in Domestic installation. But is was also proposed (which I...
  4. N

    Mercedes Vito - Racked - Registration PV 02 YOU

    MCS renewal up next month... and time to hang up the crimps and work for someone else who is accredited. So anyone interested in a Mercedes 109CDI, white, 44k miles £6,300 plus VAT and the number plate PV 02 YOU too! (prev. an 08 plate). Good condition, good runner as you'd expect from this low...
  5. J

    Part p registration

    Hi guys i have been an electrician since doing my apprenticeship in 1989. I work for an nic eic registered company but a freind has asked me to do some work for him which needs certificates but my boss wouldnt do that for me. My question is how can i go about getting part p registered...
  6. 5

    registration.

    really chuffed. had the Elecsa assessor around today, and everything was good. now registered again. there's life in the old legs yet! sole trader in three months god willing. only a van to sort out now! thanks to everyone who post on this stie.
  7. D

    Jan 2012 the last gasps for Part P registration?

    http://www.communities.gov.uk/documents/planningandbuilding/pdf/2077837.pdf For the members in England,here is a link to the consultation document by the gov that points the way that part p will evolve To avoid reading through the intro,you could start at paragraph 25 and take a close look at...
  8. D

    NICEIC Certification Scheme Blank certificates for my NICEIC registration visit

    Hi Team, Ive got my inspection in a months time in which the NICEIC engineer comes to check my work. I understand that the certificates that I have to show him as to be unlogo'ed. Can I use the certificates from this site Forms for electrical contractors - IET Electrical or is there another...
  9. D

    Part P & Scam registration for subbies

    Does anybody know if a subcontractor (i.e. me!) working for a larger contractor (domestic work only) will need my own Part P registration and Elecsa/Napit etc. registration? Or could i be covered under their registration??? Thanks dave
  10. O

    Scheme Registration

    Guys, When registering with a scheme (new to me as Im in maintenance) how do you get round certain things like: 3 phase board and unable to turn off, are you OK just taking the cover off??? Getting Ze when unable to isolate anything so therefore unable to remove main earth??? Im sure there...
  11. B

    Registration

    People working in domestic premesis get registered with a part p scheme provider can they do commercial installations under that registration or do they need to register differently
  12. S

    NICEIC Certification Scheme Confusion with registration with council, NICEIC and Part P

    Hi All Been working away in Europe for 5 years and now returned to UK. I have got 16th edition and Test and Inspection and will be taking update course for 17th edition shortly. What do I have to do to be registerred to sign off and certificate own and others work. I assume need to enrol with...
  13. R

    Needing NVQ 3 for Part P registration.

    It would appear from next year you need to have NVQ Level 3 to become Part P registered. Is this just to be classed as a supervisor or as a domestic installer as well? Won't this lessen the chance of someone installing being registered? I've done/doing 17th, Inspection & Testing and Design &...
  14. W

    Waiting for OFGEM Registration??

    We've done a few reasonable size jobs 100 to 144Kw all on ROOFIT register, we registered them in May and are still waiting for OFGEM to register them, my colleague in the office phones at least 2 twice a week and we've still not got approval yet! Anybody else having the same problem or come...
  15. T

    Current Part P Registration requirements extended past January

    Quick heads up guys, we’ve got some good news. You may have heard that the requirements to qualify as a domestic installer and sign off your own work may be changing in the New Year. However we’ve just heard that the NICEIC are going to continue with the current requirements after the 1st...
  16. A

    NICEIC Domestic Installer Registration

    Hi there, wondering if anyone would be able to give some advice I am currently starting my application for NIC Domestic Installer and my question regards the 2 installations for inspection. I currently sub-contract to a NICEIC Approved Contractor and was wondering if it would be ok to carry out...
  17. N

    NICEIC or NAPIT registration time

    Does anyone know from recent experience how long it takes to get niceic domestic installer or napit equivalent? (Everything is in place including jobs to show the inspector) I know no one can say for definate but recent experience would be nice if your in west yorkshire all the better!! Thanks,
  18. G

    Pvoutput Registration

    Just attempted to register my system on the above but when it comes to postal district it will not accept NR, NR7 our anything else I have tried. What is the correct format? (I live in Norwich postcode NR7 0##) Ta all
  19. 1

    Time between inspection and MCS registration

    Hi There Had my inspection on Tuesday with NIC. Had a couple of NCRs which the inspector emailed later in the day - I emailed direct to NIC first thing Wed. Haven't heard back yet. Does anyone know how long does it take to get MCS certification after a successful inspection? I was thinking it...
  20. I

    Elecsa registration and PIR's

    hi guys just getting ready fo joining elecsa full scope. now confused with regards to issuing PIR certs. Now it looks like they have a seperate scheme for full PIR's my concern is reguarding CU changes i would normally carry out a PIR before the change. will i have to join this seperate...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top