Hi, where could I find a template for customer complaint form and details of complaint procedure? :dizzy2:
...and a template for Guarantee Certificate for the work carried out.
Thanks in advance.
Looking at a job to price for some remedial work. 2 things i have noticed and mentioned it to the customer are, no RCD on shower circuit nor on the upstairs lighting circuits. This has been listed as code 4, not to current regs.
I have said it should be a code 2 and need doing asap.
This...
Guys I need some advice please
We did a PIR for a landlord, it threw up two code 1's resulting on the Estate agents refusing to let the propery until sorted.
The work is now complete.
What paperwork can I give to the estate agent to prove the installation is safe?
Is there a notice...
Have been to look at a job this morning that involves remedial work after a Periodic Inspection Report. This has been carried out by another Electrician, whom is Part P Registered.
The observations he has made seem to be non notifiable, as follows:
1/ Wall lights fed off 32A Socket circuit...
Now we don't have to notify a PIR and therefore we don't have to be with one of the self-certification schemes to do them. However what happens when the PIR shows up some faults? I assume if the faults require repairs which are notifiable then we're back to square 1 and we need to be a member or...
Anyone seen this on the news?
Well a friend of mine was the electrician whom carried out a PIR at that factory and he asked some questions on it on here.....
http://www.electriciansforums.net/inspection-testing-certification-electrical-installations/4811-periodic-testing-remedial-works.html...
Hi i have recently done a periodic test on a nursey and had to fail it on several points, i have gone back and completed remedial work and issued certs for remedial work.
Can i now just reissue a periodic cert with a satisfactory pass as they need a PIR for the insurance,,
Hi Guys,
I work in a big office in Brighton as an onsite electrician,we have just had our Inspection & Test and there is a couple of things i wanted to check,
When using SWA do you have to use the banjo if the armouring is ot being used as a CPC? If so can you just use it on one end or does...
I am currently carrying out a periodic test and inspection at a meat factory, the state of the installation is appalling i have found hundreds of faults ranging from damged sockects to undersized cables including a 2.5mm flex on a 250A MCCB:eek:
Obviously the installation is unsatisfactory, i...