requirements | Page 10

requirements

  1. D

    Help please with 3 phase supply into building Kva requirements

    Hi i am struggling with working out a 3 phase supply into a domestic building, the customer dosent want an oil boiler for heating, the electrical demands will be single phase 40A electric heating boiler (not heat pump) also instant water heater 40A plus electric shower 40A all instantaneous so...
  2. J

    MCS requirements For off grid PV

    Hi there , Just a quick one can anyone point in the direction of what is required under to MCS to get FITs for off grid installs ? Also Are there any places that can be recomeded for reasonably priced dc isolators (wanted a 40-60a one ) Thanks
  3. edexlab

    DNO over frequency requirements

    We've received a note from WPD with an application which has been approved in South Wales which is out of our usual area although same DNO different office: ''As a temporary measure(until 2nd March 2012) G83/1-1 may be applied to inverter connected generators rated between 16A per phase and...
  4. S

    Emergency Lighting Installation Requirements

    Hi, i have been asked today to design a new emergency lighting installation for a commercial building. i am a C&G 2330 level 3 electrician and have dealt with a few smaller emergency lighting problems in the past but never a new system of this scale. i have got copies of regs and guides for...
  5. N

    Power Shower cable requirements advice needed please

    This is my first post in these forums and I hope that someone can help me My power shower has packed up and I ideally want to fit an electric one instead, I can do all the plumbing no problem but I've looked at the wiring and what I've got is: 2.5mm twin and earth coming from the shower in to...
  6. P

    what requirements do you require to install PV.

    Evening all, have ben aproached by a few customers enquiring about pv. what do you need to start installing please, I know the new c&g 2351 does go into pv,but wasn't sure is 2330 allows you to do installs! thankyou for any help and guidance anyone can give I really apreciate it! Paul
  7. C

    Testing and Inspection - requirements of test engineer

    The company I work for recently issued a PIR for my father's employer's property (Commerical and domestic.) I have been looking into the 2391 myself and realised that the person(s) who performed the PI are not 2391 qualified. Is this PIR therefore worth the paper it is written on, (Or simply...
  8. B

    General requirements to start as an electrician in the UK

    New to this website. Just returned to the UK after 20 years and note electrical jobs and mobile fleet usage needs many certificates which were not in vogue when I left these shores. Can anyone tell me what i need to get me on the employment list. I am qualified to HNC Electrical Engineering...
  9. C

    Part L Requirements

    Is it correct that the 2010 version of part L of the Building Regs requires 75% of the light fittings in a domestic installation be fitted with low energy lamps? Has the requirement for dedicated fittings that can only take low energy fittings been lost?
  10. M

    PAT Testing Requirements

    Hi All Been asked to do some work at the local pub, they require some PAT testing + emergency lighting adding to an existing circuit. I am an electrician by trade (C+G 2330 L3) but work mainly in instrumentation nowadays. I am 17th edition trained and hold a C+G 2377 PAT testing cert. Unsure...
  11. A

    unsure on downlight requirements

    hello everyone ,always wondered when fire rated downlights are an absolute necessity ? I know itssomat to do with building regs. way i see it is they need using in near enough every case bu if so why are the non fire rated so frequently used and readily available , ?cheers everyone
  12. IQ Electrical

    More info on QS requirements

    As the subject: UK Electrical Industry Moves to Safer, Better Practices | My Local Electrician Looks like the start date is 01/01/12, ties in nicely with BS7671 2011!
  13. N

    Assessment requirements

    Just wanted to say thanks for all your advice and help as I passed my first assessment with an A grade. Quite honestly he didn't stand a chance as I hit him for 6 with chocolate Hobnobs and those new toffee dodgers, at one point he couldn't even speak, overwhelmed by the choice so thanks to all...
  14. sythai

    Petrol station work.... requirements

    Just wondering what you need to be able to carry out work (electrical) in all petrol station areas/zones....? Specialist insurance maybe ? Be good at MI or is it FP these days ? Compex ? Reason I ask is a local branch of 3 petrol stations are fed up with their current sparky and they're...
  15. V

    New ccu requirements

    Hey guys. Just interested in your opinions on this one before I speak to my NIC field engineer. I have a customer who wants a new ccu installed but his property is rather old and he has the classic 2 core twin lighting arrangement so no earths whatsoever on the lighting. I did the initial...
  16. I

    New to the forum - and here to discuss your LED requirements

    Hello all, I found your discussion forum because I am very interested in LED usage in warehouses, obstruction lighting and hazardous environments (ATEX). So, there seem to be a lot of electricians out there asking about LED lights - whether they're any good, how to fit them, what light they...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top