responsible | Page 2

responsible

  1. T

    What circuit to test?!

    Went to a mates new bungalow as he wanted me to cast an eye on his electrics to make sure all is ok, (didnt want a EICR). It is generally in a good condition, correct earthing, correct selection of MCBs, RCD etc but the lighting has no CPC. I explained the options but he wants me to re-wire...
  2. C

    No earth on installation, WHO is responsible???

    Hi, Quick question, I am busy doing a rewire on a property, really old electrics, old rewireable fuses, NO earth. Main earth cable was enclosed around a screw on the cut out fuse. Who is responsible to sort it out? I have contacted UK power network, they always say they are going to send...
  3. B

    Who is responsible for submitting appendix 3?

    I have been asked to subcontract to a solar pv firm in yorkshire when I have spare time, and will probably do so, but does anyone know who would be responsible for submitting appendix 3 to the DNO? Obviously I would be responsible for issuing the EIC and the PV test report but would I then pass...
  4. B

    If you were to go to an installation

    If you were to go to an installation and think "I don't like the look of this old board, but I'll use a separate board via Henley Blocks' or similar, would you be OK just noting on the paperwork that the original installation is a bit ****e? I mean, you wouldn't then become responsible for that...
  5. R

    MR DNO Palava

    Hi guys, I am carrying out a full install to one(top) of two flats from a converted house. Originally the house had only one incoming service head (single phase)to the property, but the new landlord decided to contact the DNO about upgrading the incoming service possibly from a 3 phase to one...
  6. K

    Who is responsible for the ryefield board?

    Who is responsible for the Ryefield board ? I own a property flat in London and I contacted recently my electrical supplier to make a full investigation based on extremely high bills. A technician came around and asked me where the main fuse or ryefield board was to disconnect the meter. We...
  7. S

    testing new extention only or responsible for the whole installation?

    Hi Guys, Im doing a new kitchen and diner extension. All circuits are new from cu. Ive upgraded bonding. When issuing an EIC am I only responsible for testing the new works? Thanks
  8. B

    The Executioner Insect Zapper - What Statistic Is Responsible For Power Zapps?

    I have bought The Executioner. There were two of them, small and bigger and former has 2 AA batteries and latter 2 C batteries. Which is more powerful for killing insects? Please see my question here. I say it is all about ampere but the other person states it depends on several factors. Who...
  9. S

    Conservation area - who's responsible?

    From what i have read planning permission in a conservation area is not needed if the PV can't be seen from the highway. I have a situation where a client wants PV in a conservation area which can't be seen from the drive or anywhere near the property, but i have noticed that glimpses of it...
  10. S

    really stupid p.a.t testing question

    As the title suggests this may seem a little strange. I recently completed the city and guilds 2377 one day course which has an exam at the end and my employer now expects me to carry out the testing. This is the stupid part. on the course i was told that if the item fails, not only should i...
  11. B

    Who is responsible?

    I have come accross an installation (which is pretty scary generally) and I am easing the customer towards a re-wire, by someone other than me (I'll probably be pulling wire though). He has two mains coming in, one very old and meter is fed by single insulated cables (looks like 25 aint...
  12. G

    who is responsible

    hi everyone, my first post so please be gentle with me. my question is this < last september i started working for a kitchen and bathroom fitting firm .i am the only electrician working for then and on average i install and test 4 or 5 bathrooms a week .all my jobs are to current 17th edition...
  13. J

    who,s responsible.

    Heres one for you all, on a friday night. on wedsnesday, our old apprentice who now has been S/E for 10yrs now rang us urgently for help. I won,t give you the firm but he,s working for a big major player in the defence of the country, a major player, whome are to do with aircraft and the like...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top