This ryefield 3phase 6way 400amp board was bought for a job but never used and has been sitting in my front room ever since. It never been used and has no holes in it.
Cost £687 when new selling for £375
If you need anymore info please call 07860163937
Many thanks nick
please fine link below...
Hi all
I am a meter engineer for a leading meter operator, I am trying to source set of Ryefield distribution board keys, obviously without stealing them as I come across them.
I have tried all the electrical wholesalers, websites ebay, gumtree etc.. does anyone now where I might b able to...
topcat72
Thread
across
board
distribution
distribution board
keys
meter
might
needed
ryefield
Hi guys
have done a small 3 phase job but know have a change to the job as their is a flat upstairs on it
I have been told I need to fit a ryfield board which will enclose 3 main fuses for the new 3 phase board and 1 fuse for the flat upstairs
can anyone advise as best a cheapest place to...
Hi
Been working through a few options with an electrician, on how to get an 4 way db to supply some new equipment being installed.
Due to the original board being pretty full up, they don't want to split a henley block out of it. As its only 100amp board and pretty loaded up already.
So...
For example you have a ryefield board with 3 phase incoming cable split into 5 fuses for each meter. 3 meters are 3 flats, 1 for communal area and 1 a small shop unit. Now does ryfield board counts as a shared supply between all of them and therefore should be 5 notifications of each property...
arturas
Thread
becsa
certification
communal
competent
cps
notification
part
part p
person
question
quick
ryefield
scheme
separate
Who is responsible for the Ryefield board ? I own a property flat in London and I contacted recently my electrical supplier to make a full investigation based on extremely high bills. A technician came around and asked me where the main fuse or ryefield board was to disconnect the meter. We...
KUDUKU
Thread
aus
board
company
electrical
responsibility
responsible
ryefield
Just about to start the common areas and basement of a site which i'm doing,
Just wondering what views people have on mains isolation of flats.
There are 4 flats and one landlord area, so 5 consumer units in total.
All to be individually metered, so do I use individual, Single phase...
Hi all,
Been today to look at a potential install and was a little concerned when I looked at where the supply was to be taken from...
Okay here goes,
Three phase 100A incomer, direct with 25mm meter tails going to a 9 way Ryefield unit, from there, there are 5 x 100A supplies feeding...
Hey
Working in a property which has been converted into 4 flats. Only a 3 Phase supply coming in so the lovely people at EDF have asked for a Ryfield board to be fitted for them.
Anyone got any help on this as i have never heard or fitted one before.