Why have section 7 - 'observations and recommendation for actions to be taken', when we now have 4 pages of 'inspection schedule'.
Also this further investigation required tick box. Am I right in saying that if you've identified something as a deviation, then no need to tick as you've...
Section 411.3.3 says:
" In a,c. systems, additional protection by means of an RCD in accordance with Regulation 415.1 shall be provided for:
(i) socket-outlets with a rated current not exceeding 20 A that are tor use by ordinary persons and are intended
for general use, and
(ii) mobile equipment...
have recently sat my fica! waiting on results but had a howler of a multiple choice paper!
i revised for weeks for about 15 questions that i reconised and 15 that i had to look up or take an educated guess at! does anyone know how this paper is marked???
i have heard different things i.e.
55%...
BigSii
Thread
anyone
choice
knowledge
led
multiple
paper
questions
section
hi people.
I'm looking at taking the AM2 exam. I'm currently studying for it but i notice the Online exam is made up of different sections.
e.g
Health Safety
Installation techniques
building regulations
etc
in my mind, it would make more sense for me to spend time studying the sections that...
Jon Boy
Thread
am2
anyone
course
exam
knowledge
online
questions
section
training
Hi, I've been asked to carry out a PIR on a Mobile Catering Van. As I haven't done one of these before, am I right in thinking that I complete as much of the forms as I can, just highlight the fact that the supply is from a generator and mobile? Schedules as normal using the generator for live...
jerrybouncer
Thread
attach
building
catering
electricians vans
generator
mobile
periodic
section
van
vehicle
Looking around the forum over the last few days I think it is about time we got a new section added. I think it could be called "Leave your handbags at the door" and it would be exclusive access only for members who see this forum as a great place to find/share information ONLY.
I stand by what...
Re: Homework or guidance?
How about setting up a learning lounge? I know this has been suggested loads of times but hear me out for a min. Set up a learning lounge/room for student electricians were they can post their questions freely without fear of the mick being taken out of them. All...
Well, BS7671 2008: Amendment 1 is due out next month but so far I can find next to nowt when it comes to useful information on what is changing. So far i know the following parts are being added.
Since most of my work is in the domestic sector i can ignore some of the changes as they are very...
Have been installing new 20 amp radials for socket outlets and lighting in a newly built office space in a small commercial unit. The new build office is part of a much larger building, and although it has its own CU, this in turn is fed from a 3 phase DB situated in the warehouse area, which in...
Don't seem to see we have one or any posts about one!
would it break any copy write of anything to have a downloads section for software and things like electrical software can be shared. example, i have a good estimator software i designed and im looking for some cable calc software. you can do...
Lookin for help, its the approved installation project for becoming approved electrician.
Car workshop, with 20 booths, canteen, office.
That much work hard too explain it really lookin for somone that has done it doing it for help
I realise I have not been on the forum for long but I thought i'd ask the Question?
Does the Forum Need/Want a For Sale & Wanted section?
I'm currently looking for tools etc etc on a budget as i'm sure a lot of other people are so maybe this will be a benefit.
Love
Alan
I have recently purchased a Megger 1553, but am struggling with the user manual....
The section of the meter that has two settings and is coloured orange is used to test continuity, that much I understand. What I am having difficulty with is the fact it has two settings.... I'm not sure which...
JamesBrownLive
Thread
continuity
help
manual
megger
needed
section
setting
think this may be a good thread for this section of the forum. a place to pop in the feedback for a sale and ensure we stay safe if buying from a trusted member
NAPIT/ HISCOX want £202 + £22 admin fee for this years Electrical, Fire & Security Contractors Insurance.
I would appreciate any recomendations of other companies to go with as I think this quote is a bit steep.
Its all about saving the pennies where possible at the moment, I am sure I am not...
I want to know if it's ok to run swa inside a mild steel 200x200 box-section, I think the main issue is support.
the length of the run is 5 meters vertically. i can support the cable at the top and bottom but not any where else.
Hey up,I've been doing some P.I.R.'s for someone and a 100% visual and 30% test was the agreed limitation.
I can't see how a 100% visual could be possible without causing all sorts of damage and how could you be sure you've inspected 100% if you didn't know about that buried RB4?Or is it 100%...
Evening all,
Can anyone tell me please if there are any standard pre-work survey templates suitable for customer files and attaching to a quote out there or alternatively a link to the subject on specific points to be noted and inspected prior to any installation. Greatly appreciated.:)
Just
Thread
before
check
chris
electrical work
other
section
survey
hi, in the section of an EIC covering Particulars Of Installation Refered To In The Certicate which covers the Main Protective Conductors when filling out the part for the earthing conductor which in a domestic situation would be the copper cable from the suppliers fuse to the board MET, if you...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc