Hi there,
I'm rewiring a small house for a friend,and it will be inspected by the council after 1st and 2nd fix.
Is it ok to have the downstairs hallway light,and the upstairs landing light on seperate circuits,but in the same 2way2gang switches in the hall and on the landing?
Any advice...
Hi all..
A friend of mine might be buying an old restuarant and he wants to turn the down stairs into offices for his business and the upstairs into a flat to rent. If he gets it i'll be wiring it for him:). But he wants the flat and the offices on two seperate meters. My questions are...
been looking at the kewtech TC4 /part "P" test forms .
if you use these were do you get the seperate smoke alarm test sheet from as stated on them as i can't find one from kew tech anywhere.
:confused:
elfyn.
Where am I going wrong, over the last 9 months at one customers premises I have installed 3 x seperate pir/hallogen fittings, all from the same circuit, nothing else on it. But every couple of months I get a call to replace one of the fittings as the PIR latches on for that fitting. Now...
Hi just done pir, had a 16mm t+e submain feeding a d/b off live side of isolator had a 10mm t+e feeding another board about 6 metres away.
Do they go on same test result sheet as they have the same supply or seperate ones stating same supply?
Would you use multiple inspection forms for a single PIR (or EIC) if for example they were in seperate buildings?
If not can anybody think of an instance where multiple inspection forms would be attached to a single PIR or EIC. (The form has a section saying " __ Scheduals of...
Hi
I just looked at a job that I have to price,basically part of some of the job is there are two electric showers in the house which aren't connected but are wired.
What he wants is me to connect up the two showers through one of those units that only lets one be used at a time..Thats the...
Would like your feedback please lads. large house finished,granny flat 5 meters away.Is it ok to split feed at meter(tails junction box)and run a 10 or 16mm supply straight to flat to new cu(also taking pme earth).Not sure of all regs (must be thick the regs are not in plain enough english for...
hi all, blimey ive done some posting today!
right on me schedule of test results, ive got a 16a 60898 mcb going to a metal clad 20a dp isolator via 2.5 t&E, only about 1/2 a metre to the isolator. from then on its a 2 core 2.5mm swa to the garage consumer unit.
im re writting me test sheet...
Just wanting to check and get advice on immersion heaters. I have wired up them before but on the job that i'm on, the house is needing 2 3kw heaters for 2 cylinders. The consumer unit is less than 10m way from the airing cupboard, so would a radial circuit with 4mm cable and a 32mcb be okay...
Hi guys im after a bit of help please.
if im running a 4core 25mm armoured to a three phase distboard do i need a seperate earth to go with it or can i use the armourings???
i thought you had to run a seperate earth half the size of the cable so a 16mm earth.
all cable calcs say u need a...
Hi, Great site you have here guys. I`v being watching for a few months, and now have a question.
In colege, they have told us that when wiring in steel conduit, all wiring is done in single core cables, as opposted to Twin+earth.
Is there a reason for this?
Would seem logical to me to use...