Im a qualified spark part p niceic domestic installer and niceic mcs installer
today got call from aerial company that fit panels for social housing can i do part p ac side and also dc side and sign it off if they mount panels not realy keen on this but thought id listen to him anyway he will...
Hi can anyone help.
Had my napit inspection back on 2nd november and past with no n/c but still not been signed off by mcs.Want to sign off my own install but can't and now dont think i will get on mcs data base before cut off date.
Just trying to re-coup some money back after doing...
i have just fininshed and tried to sign off a 9.8kw system on a 3 phase supply but MCS wont issue a cert, any ideas why as i cant get hold of anybody there!!!!!!!! thanks. i need a holiday.
I am installing a new CU in a friends house (whom is a builder himself). He is going to buy the testers to test for Zs etc,
My main question is: I have the following qualifications C&G 2330 level 2, EAL level 3 and 17th edition. Do I have to have the 2391 in order to self certificate? I know...
I am currently looking for someone who is mcs approved who can sign off solar projects in and around the west midlands. We have installers and equipment and projects ligned up all we need is somebody who can deal with the paperwork side of things on a pay per job basis. Please PM me if you are...
Had quite a few people suggest this.
Big problem I forsee is this.
I install inverter and meter or just use the serial nos and go back at a later date to install, maybe because i have not the panels or no time.
Everything is ok until mcs inspection time.
Date of invoices, delivery dates scaffold...
Hello all,
I hope someone out there can help. I was planning a PV installation which I was going to do in conjunction with my [NAPIT] electrician who I've used for a long time and he was going to use it as the job to get MCS certified. I've already bought the panels and equipment and of course...
I have been asked by an registered PV installer for an 2.5Kw system to be tested from the isolator to the main board 350 quid ...? is it a fair price ? what about the string and arrow ? how much will be to be tested ? ?
Just wondered if anyone can help. I recently installed some PV roof tiles (solar century) at a large property my boss was working on. I have connected them using supplied pre-terminated leads and gone down into attic to a DC isolator. However I never had chance to install inverter as the...
Ive just , as of yesterday done an installation in Manchester on my house to get my MCS .Problem now is NAPIT are so busy that i may not be able to get it signed off with this tarrif if i cant get mcs approved in time. Is there an option for me to get this completed job MCS signed off by a...
Hi
Someone called me today and said they had a PV system installed by a Spanish company that is not MCS accredited. They asked if it is possible for someone MCS accredited here to inspect the install and sign off.
I suspect this is not allowed does anyone know the answer?
Thanks
Right I have done a stupid thing and am looking for an answer! I can imagine the sarcastic remarks I will get to this post!!
I bought a old house which needed new electrics. I "had" a friend who has been training as a electrician and he said he would do the work and get someone from his...
Hi,
I was wondering if someone could put in quite simple terms, what I will need to do in order to be able to sign off PV panel works.
I'm a qualified electrician but only have my 16th edition and nothing else.. which has been enough to do the work I have been doing, But now I need to up my...
hi all.
i thinkin about starting out on my own .
i have done a few jobs (being extensions) for family members and i have not had to have part p as the local goverment has visited and viewed my work and only ask for results then they sign it off, under part of the planning permision...
so if i...
Any guys need a competent data installer to sign off data installs.
We are BICSI accredited engineers with over 30 years experience.
All works can be signed off to:
ISO/IEC 11801:2002 Generic Cabling Standards for Customer Premises UK.
or
TIA/EIA-568-B (More the American standard...
Hi all - I have heard an understanding - that to be able to sign off private work you need minimum:
2330 Level 2
2382 17th Exam
Part P Exam
I've heard that at the moment you don't NEED 2392 or 2391 to join some electrical bodies? Is this true??
Can anyone confirm exactly what qualifications...