site plan | Page 3

site plan

  1. T

    UK What's 1:500 on a site plan.

    What's 1:500 on a site plan. I need to know what 1cm would be in particular thanks
  2. DT1991

    Site cabin

    Does a site cabin for admin and canteen facilities fall under a construction site for BS7671 The cabin is designed to be onsite for a year.
  3. P

    On site Guide error

    Page 186 Figure G4.9 Generic schedule of test results maximum permitted Zs. These values are all the same 40,32 and 6A mcbs have the same value ?. They obviously don't proof read.
  4. tigerpaul

    Site cabin EICR

    Hi folks, We have a site welfare cabin that needs an EICR. The cabin is powered by an onboard generator, which is connected to an earth electrode. What is lowest acceptable resistance we are looking for when conducting an earth electrode test. Thanks for any advice you can give, I have gone...
  5. James

    Web site design

    Anyone fancy designing me a website? I would like something a bit more complex than a simple advert of services offered, maybe a contact us type form maybe a review section open to ideas. p.s. not looking for a freebee but don't want to spend a fortune either!
  6. bonjovi

    ever been kicked off site

    my day at being a bad boy was at covent garden in London we had this real b*tch of a health and safty officer she was gistarpo in another life everything had to be done to the letter . well myself and another guy were on 2 towers quite high up nothing major tho but I had my kick boards on and...
  7. Pete999

    Punch ups on site ! ! !

    Working on a laege housing development in Bath I was just 16, chap I was working with was a bit of a loose cannon, you didn't mess with Terry. Any how we used to run cables down cavities in those days, we had finished wiring this particular house, and we had used the opening where the chippy was...
  8. D

    TT in agriculture/ building site/ caravan.

    Hi guys, New job looking at. I haven’t been to site yet, but this is the scenario. DNO just put a new single phase supply into a field PME. Line and neutral tails terminated into a double pole isolator/ no earthing cable installed yet/ no cu connected yet. I have been asked to fit board and...
  9. B

    Distance between Gas and Electric box caravan site

    Can anyone tell me where to find distance between Gas box and Electric box on caravan site I know it’s 600mm, now on new install someone’s connected the boxes now between the edge of gas to edge of electric box is around 630mm but this isn’t taking in to account a socket which will be plugged in...
  10. the pict

    NICEIC Certification Scheme NICEIC site down again !!!!!

    I was going to go off on one but what's the use so sod them let them have their bank holiday week end and sort it on Tuesday poor things must be cream crackered I mean a 35 hour week must be exhausting with at least 10 weeks between holiday week ends lasting from Friday to Mondays, maybe one...
  11. S

    job site recommendations

    Does anyone use any sites like mybuilder, check a trade, rated people etc. Are they worth it? Knew someone a while back who was on check a trade said he never got his money worth from it. I am interested in signing up to the right one but not interested in paying for expensive leads for timewasters.
  12. V

    Becoming a sparky (with on site experience)

    Hi Eveyone, Just like to get some advice on becoming a gold card sparks. Here is some background info and i would like some info on what i can do to become a gold card electrician. I started working with my uncle at 17 in 2001 for a housing maintenance company as a subcontractor, after a few...
  13. M

    My 1st board on site advice

    Hello, I have just competed my 1st consumer unit install on site. I would like some advice on how I may improve the quality/neatness. All constructive criticism welcome Thanks
  14. B

    Caravan site readings on TT system

    Hi, have a distribution unit which feeds some caravan boxes TT system, it has upfront 300mA RCD and double pole 60898, now I’ve been sent to re gland as the disconnect times wasn’t met, but I’m getting readings of 0.30 ohms when max is either TT 167 ohms or if you go by MCB then 0.59? But the...
  15. J

    NVQ Assessments on 'site'.

    Good mornin' people, I've been told that my NVQ assessments have to be completed on site. My question is; Do these assessments have to be completed on a construction, commercial, industrial, site? Or can they be completed while doing works in a domestic property/house? Do I need to be...
  16. C

    SPD to cover whole site?

    Hi Guys, Having recently done my 18th, and various reading of SPD requirements, I feel that within the factory where I work (food industry), we should be using SPD's? We have an onsite transformer which we own, 11kV to 400v, which then splits after the meter to two main switch panels, which...
  17. N

    Caravan site, cable size

    I am pricing a job to wire 21 new pitches for a caravan park. There will be a meter box beside each caravan with a 16a trip. I will split it into the 3 phases, so 7 caravans per phase. Im just trying to figure out how to calculate the cable size. Is it better to run a ring main to pick up 7...
  18. R

    low power 110v~240v device on a construction site

    PoE details: Input: AC 100v~240v- 50/60Hz 0.3A max Output: DC 24v 0.5A PoE injector is used to convert mains AC into DC and power IP devices such as CCTV cameras and Wifi APs. These devices are designed for worldwide sale and are also widely used in the US and alike on 110v supplies. The only...
  19. R

    Advice on working on site - ltd/umbrella and Insurance

    So I have seen a few jobs, that say you must be either Ltd or Umbrella and also have insurance. If anyone could give me advice on the best way to go about setting up that would be great.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top