    Max demand for Caravan site

    Hi there, Looking for some advice with a new caravan park. There will be 25 plots for static with a potential 15 being added in the future. SP Energy have quoted to supply 150KVA 3phase. Now I work that out to be 216A but will that be per phase. And also does anyone know where I might find...
  2. D

    16 amp commando sockets. 20 amp mcb on site guide as maximum value mcb

    Hello the on site guide lists 20 amp maximum mcb for 16 amps sockets. Having a debate with someone as to why this is? Why not 16amp mcb? I installed 20 amp mcb as it's for a car charger that charger's at 16amps for 8 hours and is not capable of pulling more than 16 amps but this has been pulled...
  3. M

    using power tools on site

    looking for a bit of guidance on this one. i was helping a mate fit a kitchen on a site and there was a visit from health and safety normally he works in domestic all the time so all the tools are 230v not 110v. So as he normally works domestic so using 110v is a pain he is a bit like me with...
  4. Leesparkykent

    Hours spent pricing and doing customer site meeting....

    Just a bit of a rant really....This one job that is pretty much mine as do all the builders work and the customer has confirmed that I'm doing the job. 6/7 bed house just around the corner from my house. 1st site meeting I Sit down with the customer for 2 hours and went through what ideas they...
  5. Sparky_marky2

    Stolen tools on site?

    Hey all, Just like to know your thoughts on stolen tools on site, I was working a job awhile back for Derby uni and the spark I was working with had a Makita Impact drill + battery stolen out of his bag even though we were working in a quiet area and we went upstairs to collect materials no...
  6. G

    2 electricians on site at any given time - your feedback

    Hired and trained a relatively new electrician. Getting along ok as far as competency goes so far. However, a few issues with him that I wanted to get your guys feedback/opinion on. 1. Doesn't like to go to any domestic site solo even for the simplest jobs. Has demanded he always has someone...
  7. D

    NICEIC Certification Scheme NICEIC site assessment pass..... what now?

    So I had my very first office and site assessment today which I'm pleased to say I've passed and the assessor said he will put in the report as a pass. Which is good, but.... He says that his report goes into the NICEIC and from there they will look at it and be in touch when it is internally...
  8. Paul228

    Site transformer 3phase to 110v

    I need a couple of 3phase site transformers for a job which will last 6 months. Hiring or buying new will be too expensive, so I'm after getting a couple of second hand ones. I can collect within a 60miles of Leeds or 30 miles of Dublin. Spec. 8 to 10kva continuous. 3phase input, 110v output...
  9. J

    Pre work/site survey sheet template

    Hi all Can anyone point me in the direction of some site survey/pre-work survey sheet templates (Excel format?) for gathering info at quote stage? Thanks J
  10. A

    ALEX HERE NEW TO THE SITE

    Hi there im Alex from Suffolk hope everyone is well, looking forward to hearing from you and joining in where I can
  11. cliffed

    Site agents rule the world

    Right t...t of a site agent,requesting all workers at all times to wear hard hats,no shorts,he's always right on any works,told him literally to f..k off,real unpleasant site to work on,anyone had the same treatment.
  12. J

    hello all, new to this site

    hello all, new to this site
  13. P

    newbie to the site and would just like to say hello to you all on here

    Just want to say hi to you all, and thank you in advance for any advice im given on here.. im a mom to 4 boys just after the odd bit of help/advice as having to learn diy by myself.
  14. W

    New to site, looking for advice on supply to steel container .

    Hi, Everyone and thanks for the welcome from Dan. I had originally been asked to install a light in a small steel container, used as a tool store at a commercial premises. The container is situated outside, mounted on wooden sleepers on a concrete base. Its sandwiched between to large wooden...
  15. P

    Caravan and Camping Site - Diversity

    Hi Guys I'm doing an EICR and making expansion proposals for a Caravan Site. This is for holiday not static caravans. Simple question - how many 16 amp outlets can I have off a 63 Amp supply? Currently 8 pitches are fed from a DB containing individual 16 Amp RCBOs, fed from a 63 amp supply...
  16. D

    Newbie to the site

    Hi guys, just thought I'd say hello. I've just done my Part P so that i can safely make alterations to our circuits at work, should be registering with Napit as soon as i get my cirtificate. Then I'll be buying some kit, so far I'm set on a Kewtech K63 meter unless i can be persuaded...
  17. G

    new to site

    hi every one and welcome new to site a bit late but happy new year to all
  18. D

    New to the site, from Northern Ireland

    Hi I'm Dave and like the title says I'm new to the site :) I currently hold EAL NVQ level 3 , C&G 2394/2395 and 17th edition. Also been thinking about going out on my own when I return from my holidays in a few weeks time, likely doing domestic work. But just thought I'd introduce myself and...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top