Hi Solar Forum
An extension to a solar pv system will require a newgeneration for the extension, I understand that.
The existing solar pv system has an export meter.
Will the extension to the solar pv system also requireits own new dedicated export meter?
The reason I ask is because the...
http://www.solartwin.com/wp-content/uploads/2011/08/Combi-prefeed-NONmodulating-giff.gif
http://www.solartwin.com/solartwin-features/basic/plumbing-in-solar-thermal-to-a-combi-boiler-combination-boiler-geyser
Hi all imhaving a 4kw solar pv system with an immersion controller(i dont have an...
Hi guys
need a little guidance on a install I got to do this week
we got a bungalow on a 3phase supply with 3phase cu
The kit we have is as follows
3 x inverters 3.6 growatts
1x 3 phase meter
i was thinking of taking a 3 phase supply to workshop Not far so thinking of 6mm swa
on a 3p mcb...
Hello,
We are currently looking for solar PV fitters based in the midlands with the relevant qualifications, to work under our MCS banner.
Bpec Solar PV or equivalent, working at heights etc.
Please feel free to message me on here for further info or with any questions you may have.
Regards,
Joe
Hi, I'm looking for some advice on a 5kw system. I've done three other installs <4kw single line. This install is going to be 3 line so I'm just checking if it's really the same or if there's anything I should look out for. I'm using a three line inverter will this even the loading on the lines...
Hi Guys
looking for a couple of quotes from local instalers please
am in holbeach lincs,PE127NG
looking for a 4kw ( black on black ) system , decent inverter ,would like a 10 yr warranty as a minimum
have a large south east facing roof about 25 degrees angle, no shading issues on roof, roof is...
Hey, I have been set some homework and I am really struggling to find out the information i need so i thought this may be the place to get some help.
I need to list all materials needed to install a 4kw Solar PV system and also the price/cost of everything needed.
This may look like a lazy...
Hi.. I have just installed a 30kwp solar pv system. When doing the dc testing i noticed that there was a ground fault. Voltage between positive & earth and negative & earth on 1 string. This should be easily rectified but the inverter is not picking up a ground fault? Its an sma 15000tl. Also...
We are an MCS accredited solar PV installation company looking for sub-contractor installation teams throughout England and Wales.
Specifically, we are looking for two types of suitably qualified, experienced and self-sufficient teams that are able to carry out installations.
The first type...
Have 100mtr drum of Solar PV cable for sale,
100 mtrs 4mm 2 core SWA
The wooden drum is damaged by a water leak at my lock up, otherwise its as new from the wholesalers.
I'm Basildon, Essex based,
Looking for £50.00
Paul Mills.
Just a quick question for you solar guys. I have flagged up on a couple of eicr certs a few notes on the pv installation. I have noted that there is no dc isolator. There is no walkway to the inverter. There is no lighting near inverter. There is no crash board below inverter and the string...
Hi Guy and Girls, I'm currently working for a large installation company who have a tight grip on the Solar PV industry. I am recruiting for individuals or teams with solar installation experience. The work is on an and on-going basis around London and the South East.You must have a UTR number...
Hi Guy and Girls, I'm currently working for a large installation company who have a tight grip on the Solar PV industry. I am recruiting for individuals or teams with solar installation experience. The work is on an and on-going basis around London and the South East.You must have a UTR number...
We've got a full demo roof set up showcasing Viridian Solar's fully BBA approved roof integrated solar PV and solar thermal panels on our stand at the Home Building and Renovation show in Harrogate this weekend (Friday-Sunday 1-3 Nov).
Stand 252 if anyone's interested, happy to discuss it with...
Hello all,
The results from this poll are to clarify the results for a single question from the survey I have posted earlier in this forum, ‘Researching the decision process behind the adoption and non-adoption of solar PV panels in the UK’. (in the forum post - Have you installed or...
I'm uncertain regarding the relative advantages and disadvantages of two systems:
1. Elios4you to monitor the system and the linked Power Reducer to heat the hot water.
I have not been quoted a price for this system. Can anyone advise?
2. A Geo Solo PV Monitor and an Immersun Unit.
I...
A farm I have done some work for are having an array installed by a third party but I have been asked by the farmer to do some additional work not included in the PV install. At present there is a PME supply into a workshop from which a 25mm 2 core SWA has been buried underground and run to a...
Hello. I am a project manager for a large solar PV installer with a long-term contract UK wide. Currently looking for teams based in South-East and/or sparks in Nottingham / Glasgow areas. Interested? Give me a shout [email protected]
Hi
I can understand that, during a power cut, an inverter connected to a PV array needs to shut down to prevent maintenance workers on the grid but I don't see why the inverter cannot still continue to provide domestic power. Surely all that is needed is an isolating relay which can distinguish...
Hello all,
I am a third year student at the University of East Anglia researching the decision process behind why people choose to install or not install solar photovoltaic (PV) panels on their homes for my dissertation.
If you have ever considered installing, are going to install or have...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.