    Hi and straight in with a question....

    Hi, I know there is already threads on here about risk assessment and method statements - but I thought I would put this in just to get may thread going. Has anyone come across a decent package for the above that is not overly pricey (or free ;-) ). I primarily carry out domestic work and have...
  2. M

    installation of a hot tub

    Hi, I am installing a hot tub in a friends garden,I am using 2.5swa cable straight out of the dis board on a 32A mcb,to a commando switch/socket,I am not sure if i have to use an rcd aswell next to the socket??
  3. Prime Design

    IR Tests & Fault Finding

    Hi fellow electricians, I'll get straight to the point. How low do the readings for an IR test need to be on 250V or 500V scale before a 30mA RCD or 32A MCB trips when the circuit is live and in operation and where would I find that information? I know it will trip straight away with a dead...
  4. M

    mains wiring

    hey all pricing a big job that the board have also quoted for and want to know whats best way to go. the job is new build flats in existing building ryfields in risers on each floor.what I want to know is can I then feed from ryfield to each flat (meter in the flats) with an swa straight from...
  5. D

    site work

    Hi chaps Ive just recently started out on site again and been given the task of installing lots of cable tray sets ( made by hand ) that go into mains cupboards etc. All this is to be done on a price per meter so i have been tasked with finishing off what the last guy didnt do which is all...
  6. S

    straight to I&T....

    Probably a stupid question but is it ever done to get into inspection and testing with a very small amount of practical experience achieved? Enjoying this part of the C&G course as I am it seems a shame that it would have to be a minimum of five years before I could do it again. Fair enough...
  7. D

    CCU Tails do I need to RCD

    Ok I have a CCU change, the meter is in a outside cupboard and the tails pass straight though the wall.....but not horizontal or vertically run in the building fabric, do I need to RCD these tails my gut says yes. Btw they are not in any trunking/conduit just sitting on brick Thanks
  8. T

    contactor fed straight from dno meter.

    Any 1 ever seen a contactor wired from dno meter which has 1.5 coming out meter for economy 7 to switch contactor, have these meters got a fuse in them to protect the cables.
  9. T

    Bathroom extract fan installation, flex outlet or not?

    Hello all, I've been reading posts on here about bathrrom extracts, and got me thinking. Do you guys install a flex outlet adjacent to them or do you simply go straight in to the fan. I've always used a flex outlet, as these things never tend to last over 2/3 years and it makes replacement...
  10. W

    oven with 13amp socket

    I have an electric oven with a fused 13amp plug connected. If I remove the plug would it be ok to change the wire from the cooker to a 4 or 6mm t and e and wire it straight into the cooker outlet plate?
  11. A

    RCD is it a problem with RCD or is it just imbalance?

    So that's what happened,it's all new house re-wire ,shiny hagger 18 way dual RCD CU.Everything is tested and energised apart from bathroom lights,I was changing the switch,bathroom msb was off,cutted the feed and expected RCD to trip but nothing happened,usually they do trip straight away. Then...
  12. tigerpaul

    RCBO's

    Why do manufacturers give RCBO's curly neutral cables? When you fit them into the board they look a right mess, especially when there are a lot of them. If they were given straight neutral cables you would be able to dress them all neatly down to the neutral bar just as you do with your...
  13. S

    Trouble lining up 4x sockets on glass splash back

    Hi guys, I'm hoping someone has got an idea for me! I've got four accessories to line up on a glass splash back, all flat plate metal finish. There's 1x cooker (dble), two SFCU (sngles) and a double socket. I bought three of the brackets that join metal back boxes together, and they are...
  14. S

    registering first job

    Hi. Registering first job. I thought it was 5 quid per registration. I'm with Napit and it costs £15 per token. Been a long day and just finished. Am I missing something
  15. Rockingit

    Terminating SWA - but not straight into the box - clever ideas?

    Hi all, I've got a new build project just confirmed today, and already hit the first head-scratcher. It's a timber frame building (or will be!) and the main incoming to the house is via SWA from an adjacent pump room which is acting as a central hub for various sub-mains and where the income...
  16. S

    How can I gain experience as an electrician's mate straight from college?'

    I am 35 years of age and completed my Levels 2 & 3 City & Guilds 2330 in Electrical Installation and have my IEEE 17th Edition wiring regulations. I have started sending out my CV to local companies and registered with most of the employment agencies but to date nobody has offered me anything...
  17. J

    Do you need Part P for Straight swap.

    Been asked to change a fuse board. Its not getting moved just straight swap, do I need to be part P to do it?? (Got all other relevant qualifications).
  18. N

    I can't seem to get any straight answers! Help please!

    Hello reader, I have started a part time course in college for 2 years which will include learning electrical engineering at level for the first year and completing a 2330 C&G in the second year, I do not know who to ask as to where this will get me and how fast it will get me in to the trade...
  19. C

    did my am2 and went over on my installation anyone know if thats a straight fail

    as said in the tiltle i did my am2 over last 3 days but i went over by 33 mins on my installation, does anyone know if thats a fail. all my istallatin was elecrically sound and all test results were good, and functional test everything worked, just a bit worried about going over my time. on...
  20. M

    Straight in at the deep end with a ground mount system

    Hi Newly MCS accredited and looking at a 4kW ground mount system to quote for....yikes! I'm thinking of the Schuco system which seems pretty robust, along with concrete pads. However, I'm wondering what sort of 'design' is required for the concrete. Is it 'make it big and heavy' so it...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top