  1. P

    Rough jobs

    Today moved 4 panels for company that had loads of work in the november madness!! well starters WRONG mid and END clamps (too small) cannot tighten to correct torque! (will defo move in couple of yrs) also brackets fixed with 1 screw ! cables and mc4 connectors laying on roof in full view ...
  2. S

    P.V survey

    Had to survey a job today for the first time, normally I install but times are hard so i'm on the ground! Its a 4kw system, fitted onto a corrugated steel outbuilding roof approx 40 metres from the main house. SWA cable to be trenched in by customer, TNCS earthing from an over head supply. My...
  3. N

    NAPIT Certification Scheme Napit

    Had my assesment in early November completed with no n/c,now been 5 weeks and still not on mcs reg.Phoned Napit again(about 4th call) today to get relpy Oh someone filed it it wrong place will do it now and do a internal report into matter......AHHHHHHHHHHHH.....Still wont guarantee be done by...
  4. K

    Trade mags

    Afternoon all, I just pased the 2399-11 and I'm left with more questions than answers :( Anyone know of any trade magazines for products/jobs etc. Any trade shows coming up? Is the InstallerLive at the NEC a little too plumber based. Lastly, how the heck do I learn to do an energy efficiency...
  5. P

    About to embark on first 10kWp Survey

    Hi As the title says, I've got a 10kWp survey to do and was just after a bit of info before I proceed... 1) If the site is not 3-phase, then I will need to pre-notify the DNO. If the DNO approve 10kW, presumably it'll be a G59 application? 2) What would be a good inverter (single phase) for...
  6. R

    Another customer rescued

    Today I rescued another customer from the clutches of an overcharging, smooth talking, pressure sales bunch of *astards... £13,000 for a 2.3kWp system, took the deposit, didn't provide a SAP calc, no cost benefit analysis, no site survey, no record of the panels or inverter to be used...
  7. 1

    Structural Survey Info

    I've been asked to provide info on on snow, wind and dead loading on a PV system by a structural engineer. I've costed the system on Segen's web site. Its 1 row of 8 panels. They can't help with this info. Any ideas how I can provide this info. Many thanks Simon
  8. Y

    British Photovoltaic Association (BPVA)

    Is anyone out there a member of the BPVA? I have received a survey request offering half price memebership. £500 instead of £1000. Sounds a bit steep to me are they a genuine representative body. Apologies if you have seen this in a non PV section of the forum already.
  9. yellowvanman

    Paying for structural assessments

    There is another thread talking about the need for structural assessments but how do you pay for them? Is the customer's deposit taken and a clause in the contract stipulates that if the structural survey fails (or re-enforcement is required but the customer doesn't want to do it) then the cost...
  10. B

    Electrical Survey On Property

    Hi, ive been asked to take a look at a property for a friend whos thinking about buying it. He just wants to know what the currrent state of the electrics are and if any work would need doing on it. Usure on the age of the property at the min but where its located its probably going to be old...
  11. PeakSteve

    Solar surveying tools?

    I'm new to pv (done training, but not yet done an installation). Can anyone recommend tools, or a supplier, who deals with sun path surveying tools (I'm wondering if an old-fashioned sextant would be a useful purchase)? Any other advice or info would also be welcomed. Thanks and regards to all...
  12. B

    Anybody already have a site survey form they can send me?

    Hi, i'm currently making a site survey form for solar pv installations. Was hoping someone may already have one so i can compare and see if i have missed any information required. As we all the know the site survey is key. cheers
  13. S

    Pre-work survey sheet

    Hi guys, I'm looking for a pre-work survey sheet, template, so I can record test results such as Ze, Bonding, PFC etc for when doing cu changes etc, many thanks.
  14. G

    Require a PV Survey !

    Just wondered if there are any companies that require PV surveys, as i know how difficult it is to try and do everything.....be in all places.. Travelling for the odd survey can be very time hungry, I have been found to be very cost effective for companies as it frees their valuable time up for...
  15. RWJ

    NICEIC Certification Scheme NICEIC Part P Survey

    NICEIC is asking government to listen to its registered contractors over proposed changes to Part P of the Building Regulations. A comprehensive survey was sent out to NICEIC registered contractors and 1,500 surveys were completed and returned. Find out how the contractors surveyed view...
  16. F

    Site survey, voltage data logging

    Hello all, I have ran into a problem with a SB3300 tripping out on a recent install. After checking mains volts and hertz I got a reading of 50.2 hertz and voltage fluctuating between 252v and 262v. A quick read of the inverter spec makes me think over voltage is the problem. Can anyone...
  17. S

    Part P, we want your feedback!

    So who got the NICEIC Part P survey via email? I read last year that the government were looking at Part P amongst other building regulations mainly because of the rants on the website that was set up to have your say on what laws should go or be amended. What's everyones thoughts on Part P...
  18. G

    Sight Survey

    I went out to look at a possible pv install yesterday and the project manager has requested a price to install a possible 50kw system! It is an old farm complex that has been done up and has 2 phase overhead lines running to it. The array would be ground mounted about 40 mtrs from the incoming...
  19. G

    Giving customer quotes

    As MCS accredited installers how do you guys give your prospective customers a price do you give them a price there and then or do you carry out your site survey then come away and do all your SAP calcs etc and get back within in a day or so. Whats best ?
  20. S

    any free design and survey software

    is there any free software for surveying and designing which will help please the mcs

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top