Hi chaps , been testing some pc set ups. Each station has a pc supplied with a standard 3 pin iec , and a monitor with a standard 3 pin iec.
Been testing the cords separate for earth continuity, insulation and polarity. Then i connect cords and then test again, pc for earth bond at 100mA...