I'm curious too as to what happened to the ring final circuit? Hopefully it wasn't needed for anything!
On the RFC, you are allowed a spur at the origin, and thus keep the ring.
I'm curious too as to what happened to the ring final circuit? Hopefully it wasn't needed for anything!
On the RFC, you are allowed a spur at the origin, and thus keep the ring.
Apologies I didn't explain that very well, the builders on site ripped all the existing conduit out and with it the existing ring final, leaving it broken on the floor and live, so I dissed it all and put it in the skip, customer just needed one 2g putting back.
Thanks for the replies, I think despite the rating of the socket you should allow for 26A maximum, as you could in theory plug 2 x 3kw loads into it. The 2.5 cable would have been sufficient I feel and is protected from overload by the plug top fuses.
No I didn't look into getting a £5 MCB - my regular wholesaler does not stock proteus 3871 MCBs i dunno whats up with them??